My WebLink
|
Help
|
About
|
Sign Out
Home
Search
11/13/2000 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2000
>
11/13/2000 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2014 12:37:03 PM
Creation date
2/14/2014 11:27:18 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
11/13/2000
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
•TKDA <br />• <br />• <br />TOLTZ, KING, DUVALL, ANDERSON <br />AND ASSOCIATES, INCORPORATED <br />ENGINEERS • ARCHITECTS • PLANNERS <br />MEMORANDUM <br />1500 PIPER JAFFRAY PLAZA <br />444 CEDAR STREET <br />SAINT PAUL, MINNESOTA 55101 -2140 <br />PHONE: 651/292-4400 FAX: 651 /292 -0083 <br />To: John Powell Reference: Interplastic <br />Copies To: <br />From: Jason Wedel <br />Date: November 7, 20 <br />Lino Lakes, Minnesota <br />Commission No. 11985 -002 <br />I have reviewed the revised plans for Interplastic received by the City on November 1, 2000. I <br />have the following comments: <br />1. The 903 and 904 proposed contours along the south side of the proposed building do not <br />tie into the proper existing contours and must be corrected. <br />2. The invert elevation of the sanitary sewer service at the proposed building must be <br />shown. <br />3. The need for a fire hydrant on site must be reviewed by the fire marshall. <br />4. The length of the 6 -inch PVC sanitary sewer service must be noted on the utility plan. <br />5. The length and grade of the sanitary sewer service stub to the west must be noted on the <br />utility plan to ensure that there is 1.5 feet of separation between the sanitary sewer stub <br />and the 10 -inch water service. <br />6. The utility plan must include the City standard detail for the drop connection to the <br />existing sanitary manhole. <br />7. The utility plan must include the City standard detail for the proposed sanitary manhole. <br />8. The utility plan must include the City standard details for gate valve installation and <br />reaction blocking of the watermain <br />9. All watermain fittings must be noted on the utility plan. <br />10. The construction entrance must note that the width is a minimum of 20 feet. <br />11. There is a note on the Bale Check Detail that refers to a detail below, however, there is no <br />detail below. <br />12. A legend must be provided on both the grading plan and the utility plan. <br />If you have any questions or comments regarding this review, please contact me. <br />An Equal Opportunity Employer <br />
The URL can be used to link to this page
Your browser does not support the video tag.