Laserfiche WebLink
Encroachment: <br />One asphalt parking lot, one four -inch (4") PVC forced main sewer, and one eight -inch (8") C900 plastic water main will <br />cross Grantor's pipeline and easement, (the "Encroachment"), as depicted and/or described in "Exhibit A", which is <br />incorporated herein by reference, and as further detailed in Section 1 below. <br />Contact: <br />Grantor Contact <br />Name: Ed Traut <br />Telephone: (320) 232-8910 <br />Grantee Contact <br />Name: Community Development Director <br />Address: 600 Town Center Parkway <br />Lino Lakes, MN 55014-1182 <br />Telephone: 651-982-2427 <br />Special Provisions: <br />1) The parking lot must maintain a cover over Grantor's pipelines of forty-eight inches (48"). <br />2) The PVC forced main sewer must maintain a separation of twenty-four inches (24") or greater from Grantor's <br />pipelines. <br />3) The C900 plastic water main must maintain a separation of twenty-four inches (24") or greater from Grantor's <br />pipelines. <br />4) All utilities must cross Grantor's pipeline at an angle of sixty (60) to ninety (90) degrees. <br />5) Grantee shall not install, or permit the installation of, monuments, light poles, woody -stemmed vegetation, or <br />similar structures or plantings within the pipeline easement. <br />General Terms and Conditions <br />1. Grantee's Facilities. Grantee may construct the Encroachment, within the Grantor Easements, subject to the <br />terms of this Agreement. Grantee shall be solely responsible for construction, maintenance, and operations of <br />the Encroachment at no cost or expense to Grantor. <br />2. Grantor's Easement Rights. This Agreement is subject to the easement rights of Grantor. Grantor may place <br />additional restrictions concerning the Encroachment, not contained in this Agreement, in order to protect its <br />easement rights and pipeline facilities. <br />3. Specifications. Grantee shall supply plans, surveys, and drawings for the Encroachment upon Grantor's <br />request. Grantee shall ensure a minimum clearance between Grantor's pipe and the Encroachment of twenty- <br />four inches (24"), or one and a half (1.5) times the diameter of Grantor's pipe, whichever is greater. <br />4. Notification. Grantee shall notify, or cause its representative to notify, the appropriate state One -Call <br />notification center as required by law, but in no event less than 48 hours prior to the commencement of <br />excavation in or near Grantor Easements. Grantee shall provide Grantor's representative a valid One <br />Call Ticket before beginning excavation. <br />5. Excavation Monitor. Grantor's representative must be onsite if any excavation activity occurs within twenty- <br />five feet (25') of Grantor's pipe. Grantee shall hand dig when within two feet (T) of Grantor's pipe. No work <br />shall take place without Grantor's staff being given the opportunity to be present at the specified worksite. If <br />Grantor determines that any proposed work may potentially cause an unsafe condition or damage to Grantor's <br />pipe, Grantor shall have the authority to immediately prevent such work from being done. <br />6. Construction. The Encroachment shall be constructed and maintained to comply with all applicable laws and <br />industry standards. Grantee shall construct the Encroachment to as close to a ninety (90) degree angle as <br />practicable unless otherwise approved by Grantor in writing. <br />7. Grantor's Facilities. Except to the extent prior written approval is granted by Grantor, Grantee will not remove <br />or permit the removal of the existing cover from over Grantor's facilities or remove or permit the removal of <br />the lateral support for Grantor's facilities. If the Encroachment crosses above Grantor's pipeline, Grantee shall <br />install sight holes to monitor the Encroachment, as it crosses Grantor's pipeline. Grantee shall ensure that cover <br />