My WebLink
|
Help
|
About
|
Sign Out
Home
Search
04/23/2001 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2001
>
04/23/2001 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2014 3:55:43 PM
Creation date
2/20/2014 10:06:26 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
04/23/2001
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AGENDA ITEM 7B <br />STAFF ORIGINATOR: John Powell, City Engineer <br />COUNCIL MEETING DATE: April 23, 2001 <br />TOPIC: Resolution No. 00 -58, Receiving Study for the 2002/2003 Street <br />Reconstruction Projects <br />VOTE REQUIRED: 3/5 Vote Required <br />BACKGROUND: <br />In order to initiate the process for construction of the next street reconstruction <br />projects, the City must first select the roadways to be included in the projects. <br />To properly prioritize the roadways, the City needs to consider whether or not the <br />roadways have sanitary sewer and water. If not, we should evaluate the <br />necessity, and timeline, for installation in the future. The purpose of the study is <br />to re -rank the roadways after incorporating utility service and need issues. <br />The re- prioritization study will be completed and submitted to the City Council on <br />Monday evening. No action is requested on Monday except to receive the study. <br />This study will be used to select the roadway segments to be re- constructed in <br />2002 and 2003. The initiation of detailed feasibility studies on the roadway <br />segments slated for reconstruction will be brought to the City Council for <br />consideration on May 14, 2001. <br />OPTIONS: <br />1. Return to staff for further review. <br />2. Adopt Resolution No. 00 -58, Receiving the Re- prioritization Study for the <br />2002/2003 Street Reconstruction Projects. <br />RECOMMENDATION: <br />Option No. 2 - Staff recommends that Resolution No. 00 -58 be adopted. <br />
The URL can be used to link to this page
Your browser does not support the video tag.