My WebLink
|
Help
|
About
|
Sign Out
Home
Search
07/08/2026 PZ Combined Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2026
>
07/08/2026 PZ Combined Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2026 8:44:40 AM
Creation date
7/9/2026 8:44:35 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
07/08/2026
P&Z Meeting Type
Special
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Lyngblomsten Lino Lake Campus Plan Set prepared by Wold Architects and Engineers <br />dated March 9, 2026 <br />Applicant Narrative <br />Lyngblomsten Lino Lakes Campus Plan Set prepared by Wold Architects and Engineers <br />dated June 8, 2026 <br />Design Guidelines Revised March 2026 <br />Stormwater Management Report prepared by Bolton & Menk revision date March 6, <br />2026 <br />Geotechnical Evaluation Report prepared by Braun Intertec dated March 6, 2026 <br />Traffic Study prepared by Transportation Collaborative & Consultants, LLC dated March <br />6, 2026 <br />Use Area Tabulation submitted by Wold Architects and Engineers dated March 9, 2026 <br />Title Commitment dated May 26, 2026 <br />BACKGROUND <br />On May 11, 2026, the City Council passed Resolution No. 26-64 approving the PUD Preliminary <br />Plan/Preliminary Plat Amendment #4 for the mixed use building. The Council staff report and <br /> resolution detail the project’s consistency with the City’s Comprehensive Plan and compliance <br />with the City Code. <br />ANALYSIS <br />PUD Preliminary Plan <br />The PUD Preliminary Plan is the master plan of the entire 21 acre development. PUD <br />Amendment #4 changed the standalone restaurant and commercial buildings to a single 4-story <br />mixed use building. <br />Use# Units <br />Townhomes20 <br />Independent Living (IL)-Campus Building96 <br />Independent Living (IL)-Mixed Use Building59 <br />Assisted Living (AL)35 <br />Memory Care16 <br />Skilled Care61 <br />287 <br />Preliminary Plat <br />The revised preliminary plat consists of the following lots and blocks: <br />2 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.