Laserfiche WebLink
Lot or OutlotPurpose <br />Lots 1-21, Block 1Townhomes <br />Lot 1, Block 2Senior Living Campus <br />Lot 3, Block 2Skilled Care Wing <br />Lot 1, Block 1 Second AdditionMixed Use Building <br />Outlot AStormwater Pond <br />Outlot BLift Station <br />Phasing Plan <br />The development will be built out over three (3) phases. This final plat is for Phase 2. <br />PhaseUse <br />Phase 1Townhomes and Senior Living Campus <br />Phase 2Mixed Use Building <br />Phase 3Skilled Care Wing <br />PUD Final Plan <br />The PUD Final Plan is for a specific stage or phase of the PUD Preliminary Plan. The <br />Lyngblomsten at Lino Lakes Second Addition PUD Final Plan consists of a 4-story mixed use <br />building at the southeast corner of the site. The first floor will be commercial uses and resident <br />amenity center. The other three floors will be 59 market-rate independent living units for <br />residents aged 55 and older. <br />The 2007 Master Planning Study-Hodgson Road & CR J states the Hodgson/Co Rd J intersection <br />is a gateway and appropriate elements are to be included in the development of the corners of <br />this intersection. Per the 2024 Lino Lakes Gateway Planning study, a gateway monument sign <br />will be located in the northeast quadrant of the intersection creating a gateway as users enter <br />Lino Lakes on Hodgson Road. <br />Per Resolution No. 26-64 approving PUD Preliminary Plan/Preliminary Plat Amendment #4: <br />1.An outdoor plaza with seating opportunities and amenities shall be constructed in the <br />southeast corner of the site to enhance the gateway corridor. <br />The architectural rendering shows a private patio with gazebo for the Lyngblomsten residents. <br />Enhanced landscaping with benches are provided for public use. <br />3 <br /> <br />