Laserfiche WebLink
D. Swimming Pool <br />Traffic Signals (service and circuits in "B" above) <br />Street Lighting (service and circuits in "B" above) <br />Transformers and Generators <br />Sign Transformer <br />Remote Control and Signal Circuits(Fire Alarm) <br />Minimum Fee <br />$25.00 per inspection <br />$ 4.00 per each standard <br />$ 3.00 per each standard <br />$ 8.00 per unit plus $.40 <br />for each KVA. Maximum <br />fee for any transformer or <br />generator $80.00 <br />$7.00 first 500 VA plus <br />$.70 each addt'I 100 VA. <br />$5.00 first 10 openings <br />$3.00 ea addt'I 10 openings <br />$25.00 <br />E. Transient Projects <br />Power supply fees as identified in "B" or "D" above plus 2 hours at $34.00 per <br />hour. Each attraction or concession inspection fee is $25.00. <br />F. Electrical work started without a permit. <br />The fee assessed for electrical work begun without filing the required permit is <br />$70.00 or double the calculated fee, which ever is greater. <br />INSPECTION INFORMATION <br />For all electrical inspections call: <br />Suburban Inspections <br />(763)434 -6868 <br />Monday through Friday (except holidays) <br />7:00 — 9:00 am <br />Please refer to your permit number when calling <br />• <br />• <br />• <br />