Laserfiche WebLink
Eagle Brook Church <br />page 5 <br />Shoreland: The western portion of the site is within a shoreland overlay district. This <br />overlay includes land within 1000 feet of the ordinary high water level (OHWL) of Lake <br />Peltier. The Minnesota Dept. of Natural Resources (DNR) establishes the OHWL for <br />water bodies designated as protected waters. The DNR had not previously determined <br />the OHWL for Peltier Lake. As a result of the proposal of this project, the DNR <br />determined the OHWL last year at 884.7. The overlay zone and the shoreland setbacks <br />within it are measured from this elevation. <br />In addition to the zoning ordinance, the City shoreland ordinance regulates uses in the <br />shoreland overlay district. A shoreland overlay allows the uses allowed by the <br />underlying zoning. A church is allowed in the underlying Rural zoning district as a <br />conditional use. Lot dimensions are the same as the Rural district: 10 acre minimum for <br />any new lots, with a 330 ft. minimum width of road frontage as well as at the OHWL. <br />The proposed church lot (Lot 1) exceeds these minimum size requirements. The <br />proposed, separate house lot (Lot 2) is not within 1000' of the OHWL and thus not <br />subject to the shoreland standards. <br />The shoreland ordinance classifies Peltier Lake as a natural environment lake. Structures, <br />septic systems, and parking must meet the minimum 150 ft. setback. The project meets <br />these requirements. Structures must be screened from the water. The existing tree and <br />vegetative growth provides an adequate screen. The shoreland ordinance specifically <br />exempts churches from the 36 ft. maximum structure height in a shoreland zone. <br />The lowest floor elevation must be 3 ft. above OHWL, so the floor must be at least 887.7 <br />to meet the shoreland requirement. The low floor elevation is 896. <br />Access: The preliminary plat shows the house driveway in its current location, <br />running along the southern edge. The proposed church driveway is about 200' north of <br />the house driveway. It will be 20' from the proposed lot line. <br />The church driveway would be nearly opposite an existing residential driveway on the <br />east side of 20th Ave. This may seem undesirable for that resident. However, it offers <br />several advantages. It minimizes the creation of an additional conflict point along the <br />road: the conflict point already exists with the existing residential driveway. In <br />addition, it would allow the traffic control personnel to help the resident onto the road <br />during church events. (Traffic control personnel should be required during services and <br />large events.) <br />The church will dedicate additional right of way to Anoka County for 20th Ave. (CSAH <br />21) to total 60 feet from the centerline along the entire property being platted and the <br />existing one -acre lot on the north part of the site. <br />Resolution 04 -17, page 5 <br />