My WebLink
|
Help
|
About
|
Sign Out
Home
Search
04/26/2004 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2004
>
04/26/2004 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2014 10:07:42 AM
Creation date
2/28/2014 11:30:18 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
04/26/2004
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />STAFF ORIGINATOR: <br />CITY COUNCIL <br />MEETING DATE: <br />TOPIC: <br />ACTION REQUIRED: <br />BACKGROUND <br />AGENDA ITEM 6E <br />Michael Grochala <br />April 26, 2004 <br />Consideration of Resolution No. 04 -49 <br />Authorizing Lake Drive /I -35W Interchange <br />Study <br />Simple Majority <br />As part of the Legacy at Woods Edge development review process, a traffic study <br />prepared by Short, Elliott, Hendrickson, Inc., identified the necessary improvements to <br />Lake Drive that would be required to facilitate development. These improvements <br />included the following: <br />1. Signalization of Town Center Parkway /Lake Drive intersection and both ramps to <br />• -35W. <br />2. Realignment of the northbound I -35W ramp. <br />3. Construction of two southbound left turn lanes between the I -35W bridge and <br />Town Center Parkway. <br />4. Construction of a southbound left turn lane at the northbound I -35W ramp. <br />5. Construction of northbound right and left turn lanes at the Town Center <br />Parkway /Lake Drive intersection. <br />While the feasibility study for the proposed improvements, both internal and external to <br />the Legacy site, is just commencing, the very preliminary cost estimate for the Lake <br />Drive improvements is approximately $2.4 million. It is anticipated that these <br />improvements would be, for the most part, temporary until the reconstruction of the I- <br />35W interchange. <br />Because of the estimated cost of the Lake Drive improvements and the recognized <br />need for improving the I -35W interchange, staff is evaluating options to: 1) facilitate <br />improvement of the interchange in conjunction with the Legacy project; 2) minimize the <br />extent of reconstruction if the interchange is constructed at a later date; and 3) provide a <br />planning base to pursue county, state and /or federal funding for interchange <br />improvements. <br />Staff has requested a proposal from SEH, Inc., to determine the needed lane <br />• configurations and geometry for the Lake Drive /I -35W interchange between Town <br />Center Parkway and Apollo Drive. The proposal includes identifying width requirements <br />
The URL can be used to link to this page
Your browser does not support the video tag.