<br />Reconstruction
<br />Reconstruction includes the complete removal and disposal of the existing bituminous pavement and
<br />aggregate base course and the construction of new bituminous surface to meet City standards. City
<br />standards include a 32-foot width (back of curb to back of curb) with concrete curb and gutter and
<br />bituminous pavement. However, the City has allowed 28-foot width for street on rural streets or in
<br />areas where the existing streets significantly narrower. These streets are reviewed on a case by case
<br />basis.
<br />It is assumed that reconstruction will included 5-inches of class 5, 2-inches of bituminous base course
<br />and 1-1/2 inches of bituminous wear course. It also includes complete replacement of the concrete curb
<br />and gutter. It is also assumed that some of the reconstruction work will require soil correction
<br />improvements. Reconstruction is proposed for pavements that have an OCI rating of 0 – 40.
<br />IV. Proposed Street Reconstruction Program
<br />Based upon our review of the information provided in the Pavement Management Report and our
<br />annual field investigations, we have developed a staged program for the reconstruction of the worst
<br />street segments within the City. The street reconstruction program has been established considering
<br />five separate project areas. The City may wish to increase or decrease the number of project areas that
<br />are constructed per year depending upon the annual budget available for the street reconstruction
<br />work. Project areas have been grouped by neighborhood and by project cost.
<br />V. Estimate Costs
<br />We have determined preliminary estimated construction costs for the street reconstruction program
<br />based on the length of the street segments and the estimated cost per mile shown in the Pavement
<br />Management Report which is $1,508,090 per mile.
<br />Phase Streets Total Length (Feet) Estimated Cost
<br />
<br />I
<br />Hokah Dr, Rice Ct, Totem Tr, Arrowhead
<br />Dr, Tomahawk Tr, Tomahawk Ct,
<br />Chippewa Tr, Arrowhead Ct
<br />
<br />10,535
<br />
<br />$3,009,125
<br />II West Shadow Lake Drive, Shadow Ct,
<br />LaMotte Dr, LaMotte Circle
<br />10,643 $3,040,015
<br />III 81st St, Danube St, Elbe St, Red Maple Ln,
<br />Holly Dr, Holly Ct
<br />10,441 $,2,982,179
<br />IV Oak Ln, Knoll Dr, Joyer Ln, Karth Rd, Talle
<br />Ln, Canfield Rd, Gaage Ln
<br />9,735 $2,780,598
<br />V 77th St, Gordon Ave, Rehbein St, Peltier
<br />Lake Dr, James St
<br />11,229 $3,207,139
<br />Total 52,583 $15,019,056
<br />
<br />The estimated costs detailed above do not include any replacement or installation of watermain or
<br />sanitary sewer. If the residents in any of these neighborhoods would like to have sanitary sewer or
|