Laserfiche WebLink
DRAFT DRAFT DRAFT <br /> <br />Reconstruction <br />Reconstruction includes the complete removal and disposal of the existing bituminous pavement and <br />aggregate base course and the construction of new bituminous surface to meet City standards. City <br />standards include a 32-foot width (back of curb to back of curb) with concrete curb and gutter and <br />bituminous pavement. However, the City has allowed 28-foot width for street on rural streets or in <br />areas where the existing streets significantly narrower. These streets are reviewed on a case by case <br />basis. <br />It is assumed that reconstruction will included 5-inches of class 5, 2-inches of bituminous base course <br />and 1-1/2 inches of bituminous wear course. It also includes complete replacement of the concrete curb <br />and gutter. It is also assumed that some of the reconstruction work will require soil correction <br />improvements. Reconstruction is proposed for pavements that have an OCI rating of 0 – 40. <br />IV. Proposed Street Reconstruction Program <br />Based upon our review of the information provided in the Pavement Management Report and our <br />annual field investigations, we have developed a staged program for the reconstruction of the worst <br />street segments within the City. The street reconstruction program has been established considering <br />five separate project areas. The City may wish to increase or decrease the number of project areas that <br />are constructed per year depending upon the annual budget available for the street reconstruction <br />work. Project areas have been grouped by neighborhood and by project cost. <br />V. Estimate Costs <br />We have determined preliminary estimated construction costs for the street reconstruction program <br />based on the length of the street segments and the estimated cost per mile shown in the Pavement <br />Management Report which is $1,508,090 per mile. <br />Phase Streets Total Length (Feet) Estimated Cost <br /> <br />I <br />Hokah Dr, Rice Ct, Totem Tr, Arrowhead <br />Dr, Tomahawk Tr, Tomahawk Ct, <br />Chippewa Tr, Arrowhead Ct <br /> <br />10,535 <br /> <br />$3,009,125 <br />II West Shadow Lake Drive, Shadow Ct, <br />LaMotte Dr, LaMotte Circle <br />10,643 $3,040,015 <br />III 81st St, Danube St, Elbe St, Red Maple Ln, <br />Holly Dr, Holly Ct <br />10,441 $,2,982,179 <br />IV Oak Ln, Knoll Dr, Joyer Ln, Karth Rd, Talle <br />Ln, Canfield Rd, Gaage Ln <br />9,735 $2,780,598 <br />V 77th St, Gordon Ave, Rehbein St, Peltier <br />Lake Dr, James St <br />11,229 $3,207,139 <br />Total 52,583 $15,019,056 <br /> <br />The estimated costs detailed above do not include any replacement or installation of watermain or <br />sanitary sewer. If the residents in any of these neighborhoods would like to have sanitary sewer or