My WebLink
|
Help
|
About
|
Sign Out
Home
Search
03/12/2014 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2014
>
03/12/2014 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2022 12:17:49 PM
Creation date
3/6/2014 3:05:40 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
03/12/2014
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C I T <br />Memo <br />Environmental <br />To: Katie Larsen <br />From: Marty Asleson <br />Date: February 3, 2014 <br />Re: Environmental Board Recommendations Talan Ridge/January 29, 2014 <br />The following recommendations were made by the Lino Lakes Environmental Board on <br />January 29, 2014 concerning Talan Ridge Development: <br />1. Soils should not be imported to the site if they would change the nature of existing <br />pervious soils. <br />2. Delineate Wetlands on the site before Final Plat. <br />3. Show the location of tree preservation fences. <br />4. Soil erosion perimeter control must be shown on the map for parcels and existing <br />wetlands on the site. <br />5. Infiltration should be provided for the 100 year flood with some pretreatment of <br />stormwater before flowing into wetlands. <br />6. Stormwater should not travel to adjacent properties. <br />7. Well point existing on the site must be mapped. <br />• Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.