My WebLink
|
Help
|
About
|
Sign Out
Home
Search
02/12/2007 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2007
>
02/12/2007 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2014 10:55:39 AM
Creation date
3/7/2014 12:26:53 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
02/12/2007
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
291
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARTICLE I <br />Responsibilities of Lino Lakes <br />A. All work to be done in constructing and installing the water system shall be <br />done subject to the approval of the Lino Lakes City Engineer in accordance with Lino Lakes city <br />standards and requirements, and upon plans prepared by Lino Lakes. Lino Lakes agrees to <br />authorize its engineer to inspect the plans and observe the site to insure that the system is <br />adequately and properly installed. <br />B. The connecting meter shall be read and a summary of water usage between <br />Blaine and Lino Lakes shall be prepared by Lino Lakes personnel and provided to Blaine within a <br />reasonable time after the last day of each year. A statement for the total water provided by Lino <br />Lakes during the year, as determined by the Lino Lakes Finance Director, shall be mailed to Blaine <br />within a reasonable time after the last day of each year. Blaine shall pay Lino Lakes all water <br />utility fees required by the Lino Lakes City Code, City resolutions and amendments thereto. The <br />specific water use rate applicable to Blaine shall be equal to the Lino Lakes rate. Statements shall <br />be due and payable within thirty (30) days of receipt. All invoices shall be sent to the Finance <br />Director for the City of Blaine. <br />C. Lino Lakes shall pay for Fifty Percent (50 %) of the construction cost of the <br />metered water connection and all connecting mains including Fifteen Percent (15 %) of the <br />construction costs for Legal, Administration and Engineering. <br />D. Except as herein provided, Lino Lakes shall be responsible for maintenance of <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.