Laserfiche WebLink
ARTICLE I <br />Responsibilities of Lino Lakes <br />A. All work to be done in constructing and installing the water system shall be <br />done subject to the approval of the Lino Lakes City Engineer in accordance with Lino Lakes city <br />standards and requirements, and upon plans prepared by Lino Lakes. Lino Lakes agrees to <br />authorize its engineer to inspect the plans and observe the site to insure that the system is <br />adequately and properly installed. <br />B. The connecting meter shall be read and a summary of water usage between <br />Blaine and Lino Lakes shall be prepared by Lino Lakes personnel and provided to Blaine within a <br />reasonable time after the last day of each year. A statement for the total water provided by Lino <br />Lakes during the year, as determined by the Lino Lakes Finance Director, shall be mailed to Blaine <br />within a reasonable time after the last day of each year. Blaine shall pay Lino Lakes all water <br />utility fees required by the Lino Lakes City Code, City resolutions and amendments thereto. The <br />specific water use rate applicable to Blaine shall be equal to the Lino Lakes rate. Statements shall <br />be due and payable within thirty (30) days of receipt. All invoices shall be sent to the Finance <br />Director for the City of Blaine. <br />C. Lino Lakes shall pay for Fifty Percent (50 %) of the construction cost of the <br />metered water connection and all connecting mains including Fifteen Percent (15 %) of the <br />construction costs for Legal, Administration and Engineering. <br />D. Except as herein provided, Lino Lakes shall be responsible for maintenance of <br />2 <br />