Laserfiche WebLink
3 <br /> <br /> <br />The property is guided for Medium Density per the City’s Comprehensive Plan which requires <br />a net density of 4.0 to 5.9 dwelling units per acre. The proposed plan of 4.02 units per acre is <br />consistent with the Comprehensive Plan’s guided land use and density. <br /> <br />Concerns were brought forward at the public hearing regarding the medium density. It is <br />important to note the developer is required to develop at 4.0 to 5.9 units per acre per the City’s <br />Comprehensive Plan. The proposed development at 4.02 units per acre is the lowest end of the <br />medium density spectrum. The highest medium density allowed at 5.9 units per acre could <br />create 463 total units which is 147 units more than proposed. The PUD flexibility is not <br />creating anymore density than is allowed. The flexibility actually allows for the lowest possible <br />medium density and single family detached homes. It should also be noted that of the 216 <br />single family lots proposed in the preliminary plat, 186 of them exceed the minimum R-2 <br />requirements for lot width (60 feet) and lot size (7,500 s.f.). <br /> <br />The proposed project will also require a City Council resolution to amend the five (5) year <br />Utility Staging Area boundaries since the site spans two different areas (1A and 1B). <br /> <br />Subdivision Ordinance and Comprehensive Plan <br /> <br />The PUD Development Stage Plan/Preliminary Plat has been reviewed for compliance with the <br />comprehensive plan, zoning and subdivision ordinance. The proposed development is not <br />considered premature and meets the performance standards of the subdivision and zoning <br />ordinance. The City will require a combination of land dedication and cash in lieu of land. The <br />proposal dedicates 5.04 acres of parkland and trail which will be deeded to the City. A Tree <br />Inventory Report, Tree Preservation Plan and Landscape Plan have been submitted which <br />identifies existing trees, trees to be removed, new plantings, basic use area, natural resource <br />conservation area and natural resource protected area. The Landscape Plan identifies required <br />Boulevard Trees, Buffer/Screen Plantings, Open Area Calculations and Replacement Tree <br />Schedule. The applicant has started the Letter of Map Revision (LOMR) process with the <br />Federal Emergency Management Agency (FEMA) to verify the floodplain is not impacted by <br />development. <br /> <br />A Traffic Impact Study was prepared by Westwood Professional Services (November 2013) on <br />behalf of the developer to anal yze traffic impacts along 20th Avenue South (CSAH 54). <br />Conclusions from the study indicate the intersections at 20th Avenue South and Cedar Street <br />and 20th Avenue South and Street A will operate at a Level of Service A (LOS A) in the 2019 <br />No-build and 2019 Build conditions. The report notes a northbound and southbound turn lane is <br />required at 20th Avenue South and Street A per Anoka County standards. <br /> <br />Anoka County Highway Department has provided a comment letter dated January 24, 2014. In <br />general, the County’s comments relate to required additional right of way, proper sight <br />distance, turn lane construction along CSAH 54 and appropriate noise mitigation. Right of way <br />has been dedicated per the plat. Trees are being removed within the CSAH 54 right of way to <br />provide proper sight distances. Turn lanes are being analyzed at both Cedar Street and Street A <br />with final approval required by the County. A noise mitigation analysis is being prepared by the <br />developer. In addition, a landscape buffer is being planted in the rear yards abutting CSAH 54. <br />