My WebLink
|
Help
|
About
|
Sign Out
Home
Search
03-10-14 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2014
>
03-10-14 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2014 10:17:04 AM
Creation date
3/11/2014 10:10:36 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
03/10/2014
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br /> <br />11. Temporary cul de sacs shall be required where a street is terminated pending future <br />extension. <br />12. Drainage and utility easements shall be dedicated over stormwater drainage areas. <br />13. Drainage and utility easements or conservation easements shall be dedicated over <br />wetland buffer areas as required by Rice Creek Watershed District. <br />14. Outlots A, B, D, E, F, and G shall be deeded to the City. <br />15. The City and developer shall analyze different options for improvements to Cedar Street <br />West in regards to bituminous overlay and street width. <br />16. Sheet 3, Preliminary Plat Index: <br />a. Site Data shall be revised to reflect 12 Future Single Family Lots. <br />b. Total Number of Lots and Densities shall be revised accordingly. <br />17. Sheet 6, Preliminary Plat: <br />a. Lot 1, Block 8 and Lot 9, Block 10 shall be revised to omit the portion of Outlot <br />G that extends to Street I and a 20 feet easement shall be provided over the storm <br />sewer utility. <br />b. Lot 1, Block 1 and Lot 1, Block 11 shall have a 15 foot wide easement abutting <br />CSAH 54 for landscape buffer. <br />18. Sheet 9, Ghost Plat: <br />a. The City suggests future access through Outlot E if feasible. The current proposal <br />creates a disconnect within the development. <br />19. Sheets 10 & 11, Preliminary Site & Utility Plan: <br />a. Front and rear setback line for 65’-70’ wide lots shall be shown as 25 feet. <br />Building pads may remain designed at 30 feet. <br />b. Rear setback line for 50’ wide lot shall be shown as 25 feet. Building pads may <br />remain designed at 30 feet. <br />c. Verify that lots along Streets G, H and J require 20 foot side setbacks vs. 25 foot <br />setback. <br />20. Sheet 14, Preliminary Grading & Erosion Control Plan: <br />a. The garage location shall be reversed to meet the 5 foot side setback on Lot 7, <br />Block 8 and Lot 22, Block 7. <br />21. Sheet 18, Preliminary Grading & Erosion Control Plan: <br />a. The trail needs to meet the RCWD Rule F.6.(7)(iii), requiring that the linear <br />surface must be 25' from the wetland edge. <br />22. Sheet L1, Planting Plan: <br />a. Remove comment that “Blvd Trees to be installed by Builder @ Time of Home <br />Construction”. <br />b. City will require tree escrow and will install boulevard trees. <br />23. Sheet L2, Planting Plan: <br />a. Remove comment that “Blvd Trees to be installed by Builder @ Time of Home <br />Construction”. <br />b. City will require tree escrow and will install boulevard trees. <br />24. Sheet L3, Planting Plan Buffer Enlargement: <br />a. Please verify landscape buffer plantings are allowed in NSP easement. <br />25. Sheet L4, Planting Plan: <br />a. Outlot G shall be added to the Open Area Landscape calculations. <br />b. 245 Boulevard Trees are required but the Plant Schedule adds up to 244. Please <br />revise. <br />c. The Schedule for Buffers and Open Areas should be separated. <br />d. The Schedule for Open Space and Replacement Trees could be combined.
The URL can be used to link to this page
Your browser does not support the video tag.