Laserfiche WebLink
PERSONNEL QUALIFICATIONS I RESUMES <br />James E. StucensKi, P.E. (continuec <br />DESIGNATED CITY ENGINEER <br />blanket. Installed storm sewer structures to maintain proper <br />water flowage between the two sides of the road and to <br />minimize the amount of silt discharged into the surrounding <br />wetland. Extended water and waste watermains lines 800+ <br />feet servicing 20 new properties. Widened the road adding <br />curb and gutter and pedestrian /bike path. <br />PROJECT MANAGER <br />Elm Street MSA Improvement <br />Lino Lakes, MN <br />Project included State Aid standard reconstruction of <br />5,000 feet of street, 1,500 feet of watermain pipe, and <br />3,200 feet of sanitary sewer pipe. Widened the road <br />adding curb and gutter and pedestrian /bike path. <br />PROJECT MANAGER <br />2002 - 2011 Sealcoat, Overlay, and Surface <br />Water Management Projects <br />Lino Lakes, MN <br />Prepared and oversaw the plans and specifications as <br />well as the construction. His extensive work with the <br />lock contractors have provided value and low bid costs <br />through the years. <br />PROJECT ENGINEER <br />Apollo Drive MSA Utility and Street <br />Improvements <br />Lino Lakes, MN <br />Feasibility report and Environmental Assessment <br />Worksheet, as well as engineering design, specifications, <br />and construction administration for Apollo Drive, an <br />arterial roadway parallel to I -35W. <br />PROJECT ENGINEER <br />Deferred Maintenance of Public Facilities - <br />Metro Transit <br />Metropolitan Council Environmental Services; MN <br />Engineering services to inventory the existing conditions <br />of each of Metro Transit's 35 existing public facilities, <br />determination of proposed improvements, and <br />preparation of improvement cost estimates. <br />PROJECT ENGINEER <br />Hodgson Road Trunk Watermain <br />Lino Lakes, MN <br />Design, plan, and specification preparation, construction <br />administration, and easement acquisition services for <br />installation of a 12 -inch diameter trunk watermain. <br />TKDA <br />ENGINEERING • ARCHITECTURE • PLANNING <br />PROJECT ENGINEER <br />Control and Telemetry System Improvements <br />Lino Lakes, MN <br />Removal, upgrade, reprogramming, and reinstallation <br />of control panel at Lino Lakes City Hall, installation of a <br />remote telemetry unit at the City's new elevated tank and <br />reorientation of UHF radio antennas at the City's two well <br />pumphouses. <br />PROJECT ENGINEER <br />Reshanau Lake Estates - Fourth Addition <br />Lino Lakes, MN <br />Street, sanitary sewer, watermain, and storm sewer <br />designs as well as construction contract administration <br />and project observation for the Reshanau Lakes Estates <br />South subdivision. <br />City of Lino Lakes I City Engineering Services <br />6 <br />