Laserfiche WebLink
involve manhole rim adjustments, infiltration prevention sealing, and repair work <br />on the manholes. <br />Prior to reconstruction of the street, it is recommended that all sanitary sewer <br />lines be televised and inspected. Any isolated areas that may pose potential <br />problems in the future would be repaired as required. <br />4. Watermain <br />City water is currently not located in the Project area; however, it is available on <br />Ware Road and Birch Street to service this area. The properties are now served <br />with individual wells. Reconstruction of the street provides the most opportune <br />time to add watermain improvements to the properties in this area. <br />It is proposed to extend 8 -inch diameter ductile iron pipe (DIP) watermain into <br />the Shenandoah Area. This will provide both drinking water and fire protection to <br />the neighborhood. Connection to existing watermains located on Birch Street <br />and Ware Road would be made. These extensions would provide service to all <br />properties, and would loop the system to provide adequate circulation and <br />pressure. The extent of the water system improvements are shown in the <br />Appendix. <br />Individual 1 -inch copper services would be extended to all properties, at <br />locations as requested by the property owners. Individual property owners are <br />responsible for making arrangements to install the water service from the street <br />right -of -way into the house, and for abandoning their well. <br />6 13849.004 <br />