My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08/06/2007 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2007
>
08/06/2007 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2014 1:09:52 PM
Creation date
3/14/2014 11:13:51 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
08/06/2007
Council Meeting Type
Work Session Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />• <br />WS — Item 4b. <br />WORK SESSION STAFF REPORT <br />Work Session Item 4b. <br />Date: August 6, 2007 <br />To: City Council <br />From: Bernie Bullert, TKDA <br />Re: Water Treatment Plant Feasibility Study <br />Background <br />Lino Lakes water supply is provided by the Jordon sandstone aquifer. This source is <br />considered abundant and meets all health requirements. The City does not treat its <br />water for iron and/or manganese removal, softening, or any other conventional <br />treatment processes. The City does provide chemical additions including disinfection <br />and fluoridation at the wellheads. <br />Blending of raw well water with treated water on peak days has been evaluated to <br />reduce treatment plant size. Blending is accomplished on peak days by sending 75 to <br />80 percent of the raw water supply through the treatment plant and using a bypass line <br />to allow 20 to 25 percent of the raw water to go directly to the water storage for <br />blending. The proposed water treatment plant is an ideal candidate for blending <br />because the raw water supplied to the treatment plant from the wells does not carry <br />contaminants which cause health related issues. During recent years several metro <br />communities have begun to use blending to reduce water treatment plant capacity. By <br />using the blending of raw well water with treated water, the City can be served by a <br />single treatment plant. <br />The treatment feasibility study utilizes two types of treatment technology and proposes <br />two different plant layouts, based on the space needs that each technology requires. <br />The acreage needed at the two proposed site locations was determined based on those <br />plant layouts. <br />At this time health requirements and resident complaints do not warrant treatment. <br />However, due to the complexities of a water treatment facility and efficient integration <br />of a facility into the City's system of pipes, wells and storage, advanced planning is <br />necessary. The study addresses water quality, future water demands, site selection, <br />plant floor plan options, future infrastructure needs, and financing / funding <br />alternatives. <br />Attached is the Draft Water Treatment Plant Feasibility Study, dated August 1, 2007. <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.