My WebLink
|
Help
|
About
|
Sign Out
Home
Search
09/05/2007 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2007
>
09/05/2007 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2014 1:49:38 PM
Creation date
3/17/2014 11:02:08 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
09/05/2007
Council Meeting Type
Work Session Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 9 <br />Lino Lakes WTP Feasibility Report <br />Cost Estimate for Pressure Filters <br />Estimated <br />No Description Cost <br />1 Mobilization, Bonds, Insurance $ 675,000 <br />2 Site Work $ 345,000 <br />3 Backwash Reclaim Tanks $ 135,000 <br />4 Treatment Plant Foundation and Building $ 1,500,000 <br />5 Coatings $ 150,000 <br />6 Hi -Rate Pressure Filters $ 1,800,000 <br />7 Backwash Pump $ 20,000 <br />8 Backwash Reclaim/Waste Pumps $ 10,000 <br />9 Chemical Feed and Storage Equipment $ 100,000 <br />10 Process Piping and Valves $ 750,000 <br />11 Plumbing and HVAC $ 360,000 <br />12 Electrical, Controls and Instrumentation $ 750,000 <br />13 Standby Power Generation $ 260,000 <br />Construction Subtotal $ 6,855,000 <br />Construction Contingency $ 685,500 <br />Total Construction Cost $ 7,540,500 <br />Administration, Engineering and Financing $ 1,508,100 <br />*Total Capital Cost $ 9,048,600 <br />Final Estimated Cost $ 9,050,000 <br />* Cost does not include purchase of land for a water treatment plant site. <br />Water Treatment Plant Study 21 13843.000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.