Laserfiche WebLink
Table 8 <br />Lino Lakes WTP Feasibility Report <br />Cost Estimate for Gravity Filters <br />Estimated <br />No. Description Cost <br />1 Mobilization, Bonds, Insurance $ 825,000 <br />2 Site Work $ 350,000 <br />3 Backwash Reclaim Tanks $ 180,000 <br />4 Treatment Plant Foundation and Building $ 1,700,000 <br />5 Coatings $ 150,000 <br />6 Dual -media Gravity Filters $ 2,500,000 <br />7 Backwash Pump $ 20,000 <br />8 Transfer Pump $ 60,000 <br />9 Backwash Reclaim/Waste Pumps $ 10,000 <br />10 Chemical Feed and Storage Equipment $ 100,000 <br />11 Process Piping and Valves $ 750,000 <br />12 Plumbing and HVAC $ 400,000 <br />13 Electrical, Controls and Instrumentation $ 800,000 <br />14 Standby Power Generation $ 260,000 <br />Construction Subtotal $ 8,105,000 <br />Construction Contingency $ 810,500 <br />Total Construction Cost $ 8,915,500 <br />Administration, Engineering and Financing $ 1,783,100 <br />*Total Capital Cost $ 10,698,600 <br />Final Estimated Cost $ 10,700,000 <br />Cost does not include purchase of land for a water treatment plant site. <br />Water Treatment Plant Study 20 13843.000 <br />