Laserfiche WebLink
Filter Type <br />Site <br />Estimated Cost <br />Gravity Filters <br />East Site <br />13,500,000 <br />Gravity Filters <br />West Site <br />13,125,000 <br />Pressure Filters <br />East Site <br />11,850,000 <br />Pressure Filters <br />West Site <br />11,475,000 <br />DRAFT 8 -17 -07 <br />TKDA recommends the City use blending in their water system. A blending option is used <br />by many cities. This provides for blending some raw water with treated water on peak <br />days. This allows the treatment plant to be smaller while a few days a year the iron and <br />manganese levels will be slightly higher. We propose a 20% blend of raw water. This <br />lowers the plant capacity from 10.4 million gallons /day to 8.4 million gallons /day. <br />TKDA looked at 3 types of filter designs to remove the iron and manganese. Two of these <br />three were determined to be viable options for Lino Lakes, manufactured gravity filters and <br />pressure filters. Floor layouts were determined for both types of filters and costs of the <br />filters were also reviewed. The floor area needs and filter costs were used to determine <br />the cost of the estimated treatment plant. <br />The site plan at each site was prepared. The proposed site plant shows the City needs a <br />minimum 3 acre site, and depending on spacing and screening, it could be 4 acres. A <br />plant rendering was made to show what a plant may look like on a future plant site in a <br />neighborhood. <br />In order to obtain all the costs for a treatment plant option, the raw water main costs were <br />determined to bring water from all wells to the two treatment plant sites. This will help <br />determine which site is the most cost effective. <br />Based on all this data, 4 estimates were made. These are estimates for each of the two <br />filter types at each of the locations for a total of 4 estimates. They are as follows: <br />There is some discussion of funding issues in Chapter XIII. We showed funding coming <br />from current residents and through the future developments. Actual funding can come <br />through water rates, building a reserve, or selling revenue bonds. <br />Water Treatment Plant Study 24 13843.000 <br />