My WebLink
|
Help
|
About
|
Sign Out
Home
Search
10/01/2007 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2007
>
10/01/2007 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2014 2:24:01 PM
Creation date
3/18/2014 10:18:47 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
10/01/2007
Council Meeting Type
Work Session Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />City of Lino Lakes <br />77th Street Realignment <br />TKDA Project No. 13849.006 Cost Opinion <br />General and Restoration Items <br />Item <br />Description <br />Unit <br />Quantity <br />Unit Cost <br />Extended Cost <br />1 <br />MOBILIZATION <br />LS <br />1 <br />$10,000.00 <br />$10,000.00 <br />2 <br />TRAFFIC CONTROL <br />LS <br />1 <br />$5,000.00 <br />$5,000.00 <br />3 <br />CLEAR & GRUB EXISTING TREES <br />LS <br />1 <br />$7,500.00 <br />$7,500.00 <br />4 <br />REMOVE & DISPOSE EXISTING CURB AND GUTTER <br />EA <br />285 <br />$5.00 <br />$1,425.00 <br />5 <br />REMOVE & DISPOSE EXISTING DRIVEWAY CULVERT <br />EA <br />1 <br />$150.00 <br />$150.00 <br />6 <br />SAWCUT BITUMINOUS PAVEMENT (FULL DEPTH) <br />LF <br />410 <br />$3.00 <br />$1,230.00 <br />7 <br />REMOVE & DISPOSE OF EXISTING BITUMINOUS PAVEMENT <br />SY <br />2,115 <br />$3.00 <br />$6,345.00 <br />8 <br />REMOVE & DISPOSE EXISTING SIGN <br />EA <br />3 <br />$50.00 <br />$150.00 <br />9 <br />REMOVE & REPLACE EXISTING SIGN <br />EA <br />2 <br />$100.00 <br />$200.00 <br />10 <br />SEEDING W /FERTILIZER & MULCH <br />AC <br />1 <br />$2,000.00 <br />$2,500.00 <br />11 <br />SODDING <br />SY <br />580 <br />$4.00 <br />$2,320.00 <br />12 <br />SILT FENCE <br />LF <br />1,500 <br />$2.00 <br />$3,000.00 <br />Subtotal <br />$39,820.00 <br />10% Contingency <br />$3,990.00 <br />Subtotal Estimated Construction Costs <br />25% Indirect Costs <br />$43,810.00 <br />$10,960.00 <br />Total Estimated Project Costs <br />$54,800.00 <br />*The estimated costs are according to average prices received on similar projects in other areas. The actual costs for this project will be determined <br />through a bidding process and can vary with market conditions at the time of the bid. <br />City of Lino Lakes, Minnesota <br />77th Street Realignment <br />TKDA Project No. 13849.006 <br />K: Ig- m\ LinoLakes1138490061docslreportslfeasrptlEOC _77th- Street 09 -18 -07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.