My WebLink
|
Help
|
About
|
Sign Out
Home
Search
10/01/2007 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2007
>
10/01/2007 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2014 2:24:01 PM
Creation date
3/18/2014 10:18:47 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
10/01/2007
Council Meeting Type
Work Session Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />City of Lino Lakes <br />77th Street Realignment <br />TKDA Project No. 13849.006 Cost Opinion <br />Street Improvements <br />Item <br />Description <br />Unit <br />Quantity <br />Unit Cost <br />Extended Cost <br />1 <br />COMMON EXCAVATION <br />CY <br />977 <br />$7.50 <br />$7,329.00 <br />2 <br />SUBGRADE PREPARATION <br />RS <br />7 <br />$150.00 <br />$975.00 <br />3 <br />SELECT GRANULAR BORROW (CV) <br />CY <br />977 <br />$12.00 <br />$11,726.40 <br />4 <br />CLASS 5 AGGREGATE BASE <br />TN <br />872 <br />$11.00 <br />$9,596.44 <br />5 <br />BITUMINOUS NON WEAR COURSE MIXTURE <br />TN <br />391 <br />$52.00 <br />$20,326.31 <br />6 <br />BITUMINOUS WEAR COURSE MIXTURE <br />TN <br />222 <br />$55.00 <br />$12,193.62 <br />7 <br />BITUMINOUS MATERIAL FOR TACK COAT <br />GAL <br />175 <br />$2.00 <br />$349.30 <br />8 <br />CONCRETE CURB & GUTTER, TYPE B618 <br />LF <br />1,092 <br />$9.00 <br />$9,828.00 <br />9 <br />CONCRETE CURB & GUTTER, TYPE B418 <br />LF <br />213 <br />$8.50 <br />$1,810.50 <br />10 <br />4" PVC PERF DRAINTILE W /BACKFILL & WRAP <br />LF <br />100 <br />$5.00 <br />$500.00 <br />11 <br />TRAFFIC SIGNAL MODIFICATIONS <br />LS <br />1 <br />$32,000.00 <br />$32,000.00 <br />12 <br />PAVEMENT MARKING <br />LS <br />1 <br />$2,000.00 <br />$2,000.00 <br />Subtotal <br />$108,640.00 <br />10% Contingency <br />$10,870.00 <br />Subtotal Estimated Construction Costs <br />25% Indirect Costs <br />$119,510.00 <br />$29,880.00 <br />Total Estimated Project Costs <br />$149,400.00 <br />*The estimated costs are according to average prices received on similar projects in other areas. The actual costs for this project will be determined <br />through a bidding process and can vary with market conditions at the time of the bid. <br />City of Lino Lakes, Minnesota <br />77th Street Realignment <br />TKDA Project No. 13849.006 <br />K: I g -mI LinoLakes1138490061 docsl reports) feasrptl EOC _77th- Street_09 -18 -07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.