Laserfiche WebLink
1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />City of Lino Lakes <br />77th Street Realignment <br />TKDA Project No. 13849.006 Cost Opinion <br />Storm Sewer and Storm Water Treatment Improvements <br />Item <br />Description <br />Unit <br />Quantity <br />Unit Cost <br />Extended Cost <br />1 <br />INFILTRATION BASIN CONSTRUCTION <br />LS <br />1 <br />$12,000.00 <br />$12,000.00 <br />2 <br />CONNECT TO EXISTING STORM SEWER <br />EA <br />1 <br />$1,500.00 <br />$1,500.00 <br />3 <br />15" RCP STORM SEWER PIPE <br />LF <br />200 <br />$30.00 <br />$6,000.00 <br />4 <br />15" FLARED END SECTION W/ TRASHGUARD <br />EA <br />1 <br />$800.00 <br />$800.00 <br />5 <br />OUTLET CONTROL STRUCTURE <br />LS <br />1 <br />$7,500.00 <br />$7,500.00 <br />6 <br />STORM SEWER CATCH BASIN OR MANHOLE <br />EA <br />4 <br />$1,750.00 <br />$7,000.00 <br />7 <br />CLASS 3 RIP RAP W /GEOTEXTILE FABRIC <br />CY <br />5 <br />$100.00 <br />$500.00 <br />8 <br />INLET PROTECTION <br />EA <br />4 <br />$100.00 <br />$400.00 <br />Subtotal <br />535,700.00 <br />10% Contingency <br />$3,570.00 <br />Subtotal Estimated Construction Costs <br />25% Indirect Costs <br />539,270.00 <br />59,820.00 <br />Total Estimated Project Costs <br />549,100.00 <br />*The estimated costs are according to average prices received on similar projects in other areas. The actual costs for this project will be determined <br />through a bidding process and can vary with market conditions at the time of the bid. <br />City of Lino Lakes, Minnesota <br />77th Street Realignment <br />TKDA Project No. 13849.006 <br />K: Ig- mlLinoLakes1138490061docslreportslfeasrptlEOC _77th- Street 09 -18 -07 <br />