Laserfiche WebLink
1 <br />1 <br />M <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />City of Lino Lakes <br />77th Street Realignment <br />TKDA Project No. 13849.006 Cost Opinion <br />Watermain <br />Improvements <br />Item <br />Description <br />Unit <br />Quantity <br />Unit Cost <br />Extended Cost <br />1 <br />CONNECT TO EXISTING WATERMAIN <br />EA <br />1 <br />$1,000.00 <br />$1,000.00 <br />2 <br />SALVAGE & REINSTALL HYDRANT AND VALVE <br />EA <br />1 <br />$1,000.00 <br />$1,000.00 <br />3 <br />8" DIP WATERMAIN, CLASS 52 <br />LF <br />435 <br />$32.00 <br />$13,920.00 <br />4 <br />8" GATE VALVE AND BOX <br />EA <br />1 <br />$1,100.00 <br />$1,100.00 <br />5 <br />DUCTILE IRON FITTINGS <br />LB <br />250 <br />$4.00 <br />$1,000.00 <br />6 <br />ADJUST VALVE BOX <br />EA <br />1 <br />$250.00 <br />$250.00 <br />Subtotal <br />$18,270.00 <br />10% Contingency <br />$1,830.00I <br />$20,100.00 <br />Subtotal Estimated Construction Costs <br />25% Indirect Costs <br />$5,030.00 <br />Total Estimated Project Costs <br />$25,200.00 <br />*The estimated costs are according to average prices received on similar projects in other areas. The actual costs for this project will be determined <br />through a bidding process and can vary with market conditions at the time of the bid. <br />City of Lino Lakes, Minnesota <br />77th Street Realignment <br />TKDA Project No. 13849.006 <br />K: Ig- mlLinoLakes1138490061docslreportslfeasrptlEOC _77th- Street 09 -18 -07 <br />