My WebLink
|
Help
|
About
|
Sign Out
Home
Search
10/01/2007 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2007
>
10/01/2007 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2014 2:24:01 PM
Creation date
3/18/2014 10:18:47 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
10/01/2007
Council Meeting Type
Work Session Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
77TH STREET REALIGNMENT <br />STREET, TRAFFIC SIGNAL, STORM SEWER, <br />SANITARY SEWER AND WATERMAIN IMPROVEMENTS <br />CITY OF LINO LAKES, MINNESOTA <br />EXECUTIVE SUMMARY <br />This Feasibility Report addresses the removal of 77th Street from Marilyn Avenue to Lake Drive <br />(County State Aid Highway 23), and realigning the roadway from Marilyn Avenue to the <br />southeast and connecting to Lake Drive at the intersection of Marketplace Drive. The proposed <br />roadway realignment length is approximately 500 feet (0.09 mile). The proposed improvements <br />also include traffic signal modifications at the intersection of Lake Drive and Marketplace Drive, <br />the construction of storm sewer and a storm water treatment facility, sanitary sewer, and <br />watermain. Refer to the proposed improvements exhibit located in the Appendix. <br />A long term goal of the City has been to realign 77th Street, providing a 4 -way traffic signal at <br />the intersection of Lake Drive, 77th Street, and Marketplace Drive. The realignment of 77th <br />Street will increase safety and provide improved access to Lino Lakes Market Place and other <br />commercial and residential developments in the area. <br />The total estimated project cost is $338,900.00 which includes demolition of a house (Parcel <br />ID# 8- 31 -22 -43 -0001) a 10% contingency and 25% indirect costs. The estimated project costs <br />do not include costs associated with right -of -way acquisition, property acquisition, residential <br />relocation, or residential severances. However, the City of Lino Lakes has provided estimated <br />costs for these items, which are cited within the Report, to assist the City in the overall financing <br />for the roadway realignment project. The project is proposed to be funded through City funds. <br />The project is necessary, cost - effective, and feasible and will result in an increase of safety and <br />provide improved access to Lino Lakes Market Place and other commercial and residential <br />developments in the area. <br />Feasibility Report 1 13849.006 <br />City of Lino Lakes, Minnesota <br />
The URL can be used to link to this page
Your browser does not support the video tag.