Laserfiche WebLink
• <br />• <br />• <br />II. EXECUTIVE SUMMARY <br />The Central Anoka County Regional Trail corridor has been established since the Anoka <br />County Parks and Recreation Department's 20/20 Vision Plan was adopted in 1998. <br />This master plan was developed to illustrate the alignment, potential partnerships and <br />costs associated with the construction of the east alignment of the Central Anoka <br />County Regional Trail. <br />This regional trail provides multiple opportunities t <br />departments and local cities to meet the needs of the <br />southeastern Anoka County and to conned the sta <br />a variety of destinations in the County. <br />This trail corridor traverses through the CJ< <br />Blaine, Lino Lakes and Centerville to th' <br />of the trail through Anoka County as propo <br />of existing paved off- street trail. This master py'q <br />that is proposed to follow CS/444/Main Street <br />to the Washington County bor <br />artner with other county <br />population in central and <br />end local trail systems to <br />of Ramsey, Anoka, Amer, Ham Lake, <br />shingtoaunty border. total length <br />is 1€ r►les. Currently, the are 3 miles <br />address the eight miles of the trail <br />CSAH 17 /Lexington Avenue east <br />Anoka County <br />Trail System Plan <br />Page 2 of 14 <br />I;fie estimated cost for this <br />project is $1,267,200 for a <br />length of 8 miles with an <br />approximate cost of $30.00 <br />per lineal foot. <br />