My WebLink
|
Help
|
About
|
Sign Out
Home
Search
02/22/2010 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2010
>
02/22/2010 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2014 3:19:13 PM
Creation date
3/21/2014 8:31:19 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
02/22/2010
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />• <br />AGENDA ITEM 6A <br />STAFF ORIGINATOR: James E. Studenski, City Engineer <br />COUNCIL MEETING DATE: February 22, 2010 <br />TOPIC: PUBLIC HEARING <br />Conditional Use Permit <br />To allow the placement of greater than 1,000 cubic <br />yards of fill in the floodplain at the Chomonix Golf <br />Course, Anoka County Parks <br />Resolution No. 10 -16, Approving Conditional Use <br />Permit, to allow the placement of greater than 1,000 <br />cubic yards of fill in the floodplain at the Chomonix <br />Golf Course, Anoka County Parks <br />Vote Required: Simple Majority <br />BACKGROUND <br />Anoka County owns and operates the Chomonix Golf Course within the Anoka <br />County Chain of Lakes Park. Rice Creek crosses Chomonix Golf Course which <br />required the construction of two pedestrian bridges about 25 years ago to access <br />the holes north of Rice Creek. In August 2009, Anoka County inspected the two <br />pedestrian bridges and structural place both bridges because of <br />temporary stabilization, the Coun bilization, tY decided to replace <br />their structural deficiencies. A plan set is attached. <br />The bridges will be replaced this winter due to the golf season, wet conditions at <br />the golf course and minimal impact that winter construction will have on the <br />greens. Wetland and floodplain mitigation will occur as part of the project. <br />Wetland mitigation will occur by utilizing wetland bank credits from the Chomonix <br />Wetland Bank. The flood plain mitigation area will take place to the east of the <br />northeast bridge. Construction documents have been prepared and submitted to <br />the City for review. <br />It is estimated that approximately 1,150 cubic yards of material will be hauled in <br />and out of the park equaling about 120 truck bads. Two access routes are <br />proposed. The south access is from Lake the alternative <br />to the south access route has b een proposed by Anoka County and <br />contractor, which takes truckloads down Aqua Lane from Lake Drive past the <br />Chomonix Clubhouse onto Sandpiper Drive to West Shadow Lake Drive and <br />onto the golf course near the barn that sits on the end of West Shadow Lake <br />
The URL can be used to link to this page
Your browser does not support the video tag.