Laserfiche WebLink
• <br />• <br />• <br />Landscape, Screening: <br />The bridge construction site is located within the Anoka County Chomonix Golf <br />Course away from any residences or businesses. Landscaping and turf at the <br />construction site will be replaced in the spring as soon as conditions permit. <br />Stormwater Management: <br />The contractor will prevent erosion and debris from entering adjacent waters and <br />wetlands. Silt fence, erosion control blanket, rip rap and mulch will be used to <br />stabilize the site and will remain in place until final stabilization has been <br />obtained. <br />Right of Way: <br />All construction work and hauling activities will take place within State, County <br />and City Right of Way and within County Park land. <br />Access and Circulation: <br />It is estimated that approximately 1,150 cubic yards of material will be hauled in <br />and out of the park equaling about 120 truck loads. Two access routes are <br />proposed. The south access is from Lake Drive along Aqua Lane. An alternative <br />to the south access route has been proposed by Anoka County and the <br />contractor, which takes truckloads down Aqua Lane from Lake Drive past the <br />Chomonix Clubhouse onto Sandpiper Drive to West Shadow Lake Drive and <br />onto the golf course near the barn that sits on the end of West Shadow Lake <br />Drive. The alternative hauling route will be coordinated through Public Services, <br />the Police Department and residents to ensure safety adherence to hauling <br />requirements. The north access is from Lake Drive down Town Center Parkway <br />to the south of City Hall past the police garage and down the park trails to the <br />golf course. The County is proposing to haul 65 to 70 truckloads through the <br />north access and the remaining 50 to 55 through the south. The County will <br />require the hauling contractors to follow posted speed limits. Haul times and <br />dates will be coordinated between City / County staff, the Police Department, and <br />the contractor to ensure access to the police garage. Public Services and the <br />Police Department will also monitor these hauls routes to ensure safety and <br />monitor street conditions. Equipment and materials for the project will also be <br />hauled in through the two proposed access routes. <br />Trail: <br />All cart paths leading to the two bridges to be replaced will be restored to original <br />condition after bridge construction. <br />Construction of replacement bridges at Chomonix Golf Course <br />Page 3of13 <br />-33- <br />