Laserfiche WebLink
• <br />• <br />• <br />The bridge construction project does not require any capital <br />improvements to City infrastructure and therefore no City funds are <br />required. <br />e. Will not involve uses, activities, processes, materials, equipment and <br />conditions of operation that will be detrimental to any persons, property, or the <br />general welfare because of excessive production of traffic, noise, smoke, fumes, <br />glare, or odors. <br />Lino Lakes Zoning Ordinance Administration <br />Amended per Ord. No. 05 -09 2 -7 <br />The bridge construction project is located at a remote site and the <br />County /Contractor will ensure adequate safety procedures along the <br />haul routes. The contractor will obey pasted speed limits, maintain <br />access to the police garage, City Hall and any adjacent residences or <br />businesses along the haul routes. <br />Haul times and dates will be coordinated between City and County <br />staff, the Police Department, and the contractor to ensure access to <br />the police garage. Equipment for the project will also be hauled in <br />through the two proposed access routes. <br />f. Will not result in the destruction, loss, or damage of a natural, scenic or historic <br />feature of major importance. <br />The bridge construction project is located at a remote site and the <br />County /Contractor will ensure adequate safety procedures along the <br />haul routes. All work will take place within City, County and State <br />Right-of-Way along with Anoka County Park Land. <br />1102.09 Shoreland Alterations <br />Subd. 2. Topographic Alterations /Grading and Filling <br />A. Grading, filling and excavations necessary for the construction of <br />structures, sewage, treatment systems, driveways and other uses permitted in <br />the underlying zoning district under validly issued construction permits for these <br />facilities do not require the issuance of a separate grading and filling permit. <br />However, the grading and filling standards in this section must be incorporated <br />into the issuance of permits for construction of structures, sewage treatment <br />systems and driveways. <br />B. Public roads and parking areas are regulated by section 1102.09, <br />Subd. 3 of this ordinance. <br />Construction of replacement bridges at Chomonix Golf Course <br />Page 9 of 13 <br />-39- <br />