Laserfiche WebLink
C. Not withstanding items A. and B. above, a grading and filling permit, in <br />accordance with Section 4, Subd. 33 of the City Zoning Ordinance, will be <br />required for: <br />1. the movement of more than 10 (10) cubic yards of material on <br />steep slopes or within the shore impact zone; and <br />2. the movement of more than 50 cubic yards of material per acre. <br />SECTION 3 <br />Subd. 12. Earth Moving and Land Reclamation. <br />(3) Application. <br />(a) The application for the permit shall be made in writing to the <br />city engineer in a form as the city engineer may designate, shall include <br />information as may be required by the city engineer and shall contain among <br />other things a map or plat of the proposed excavation or fill area showing the <br />confines or limits thereof together <br />levwith <br />el readings. The elevations <br />plan shall also include all <br />finished elevations based on sea <br />drainageways, tree inventory and preservation plan, erosion control <br />measures, final restoration improvements, and other features as required by the <br />city. <br />See attached plans. <br />(b) Each application shall be filed with the city engineer. <br />(c) Each application for permit shall be accompanied by a fee, <br />the amount of which shall be determined by the City Council. <br />(4) Conditions. The city engineer or City Council, as a prerequisite to <br />the granting of a permit, may require the applicant or the owner of the premises <br />to incorporate and attach any conditions or restrictions that it deems necessary <br />for the preservation of health, welfare, and safety of the citizens: <br />(a) Properly fence any pit or excavation and barricade entrances <br />to prevent the general public from depositing garbage or refuse; <br />Access to the site is limited and silt fence will be installed. <br />(b) Slope the banks and otherwise guard and keep any pit or <br />excavation in a condition as not to be dangerous because of sliding or caving <br />banks; <br />Slope maximums will be set at 3:1 (3 feet of horizontal for every 1 <br />foot of vertical drop). <br />Construction of replacement bridges at Chomo Pagel Golf Course 0 o 1e <br />—40— <br />• <br />• <br />• <br />