Laserfiche WebLink
that seeding and landscaping takes place as soon as spring <br />conditions permit <br />(j) Reimburse the city for the cost of periodic inspections by the <br />city for the purpose of determining that the terms under which the permit has <br />been issued are being complied with; <br />Anoka County will provide inspection of the project <br />(k) Implement the tree preservation plan; <br />The plans propose clearing s �oRSis�ng f Ash, Boxeldert�ct►on <br />limits totally to about 13 <br />Cottonwood, Poplar and Willow species. No trees are proposed to <br />be replaced in the bridge area. <br />(I) In addition to a conditional use permit, the city engineer may <br />determine that permits in excess of 25,000 cubic yards require the applicant to <br />conduct a neighborhood meeting and to notify affected property owners within <br />1/4 mile; <br />Approximately 1,150 cubic yards are proposed to be excavated. <br />(m) Post a form of security and sum as the permitted authority <br />may require, running to the city, conditioned to pay the city the cost and expense <br />of repairing or cleaning any highways, streets, or other public ways within the city <br />made necessary by the special burden resulting from transporting thereon by the <br />applicant material to or from the site, the amount of the cost to be determined by <br />the Council; and conditioned further to comply with all the requirements of this <br />chapter and the particular permit and to save the city free and harmless from all <br />suits or claims for damages resulting from the negligent excavation, removal, <br />storage, or filling of rock, sand, dirt, gravel, clay, or other like material within the <br />city; and <br />A letter dated February 1, 2010 stipulating that Anoka County is <br />responsible for any damages to City Property. <br />(n) Other conditions deemed appropriate to the application by <br />the permitting authority. <br />Working Hours Monday thru Friday 7:00 AM to 7 :00 PM and Saturday <br />from 9:00 AM to 5 :00 PM with no work on Sundays or holidays. <br />Construction of replacement bridges at Chomo P woe 12 of 13 <br />-42- <br />• <br />• <br />• <br />