Laserfiche WebLink
• <br />• <br />ESTIMATE P. 3(f) <br />2009 SURFACE WATER MANAGEMENT PROJECT <br />CITY OF LINO LAKES, MINNESOTA <br />TKDA PROJECT NO- 14252.004 <br />ITEM <br />NO. <br />DESCRIPTION <br />PERIOD ENDING: May 26. 201 D <br />CONTRACT QUANTITY UNIT AMOUNT <br />UNIT QUANTITY TO DATE PRICE TO DATE <br />PROJECT 1 - ROHAVIC LANE 1,p 5 500.00 5 500.00 <br />1 MOBILIZATION LS 1 <br />2 ROCK CONSTRUCTION ENTRANCE LS 1 1.0 5 500.00 5 500.0D <br />3 CLEAN /OPEN STORM SEWER OUTFALL EA 1 1.D 5 500.00 5 500.00 <br />4 CLEAN STORM SEWER PIPE <br />LF 200 200.0 $ 6.00 5 1,600.0D <br />5 CLEAR AND GRUB TREE (4" DIA OR GREATER) EA 1 7.0 5 250.00 5 1,750.00 <br />6 REGRADE DITCH LF 10D B4.0 5 30.00 5 2.520 00 <br />7 CLASS III RIPRAP W/ FABRIC CY 5 0.0 5 150.00 5 <br />8 EROSION CONTROL BLANKET CATEGORY 3 SY 200 150.0 5 2.00 5 300.00 <br />9 SEED / RESTORATION LS 1 1.0 5 1,000.00 9 1,000.00 <br />5 8.670.0D SUBTOTAL PROJECT 1 <br />PROJECT 2 - TOMAHAWK TR AND CHIPPEWA TR DITCH REPAIR 1.D 5 500.00 5 500.00 <br />1 MOBILIZATION LS 1 <br />2 CLEAR AND GRUB TREE (4" DIA DR GREATER) EA 2D 29.D 5 200.00 5 5,600.00 <br />3 COMMON BORROW (FILL OVER PIPE) CY 110 178.0 5 10.00 5 1,760.00 <br />4 SALVAGE AND REINSTALL 30" FES EA 1 1.0 5 1,000.00 5 1,000.00 <br />5 STORM SEWER MANHOLE, TYPE 409 EA 1 1.0 5 3,500.00 5 3.500.00 <br />6 30" RCP STORM SEWER., CLASS 3 <br />LF 48 48.0 5 100.00 5 4,600.00 <br />7 TRENCH STABILIZATION ROCK / PIPE BEDDING LF 48 54.D 5 10.0D 5 540.00 <br />8 CLASS III RIPRAP W/ FABRIC CY 3D 30.0 5 100.00 $ 3,000.00 <br />9 SILT FENCE LF 50 <br />50.0 5 3.00 5 150.00 <br />10 TOPSOIL BORROW FOR EXISTING YARD AREA CY 60 25.0 5 12.00 5 300.00 <br />11 SOD FOR EXISTING YARD AREA SY 360 360.0 5 4.0D 5 1,440.00 <br />12 SEED / RESTORATION OVER NEW PIPE LS 1 1.0 5 1,000.00 5 1.000.00 <br />5 23,810.00 <br />SUBTOTAL PROJECT 2 <br />PROJECT 3 -FAWN LANE EQUALIZER PPE REPAIR <br />1 MOBILIZATION LS 1 1.0 5 500.00 5 500.00 <br />2 REMOVE BITUMINOUS PAVEMENT SY 9D 97.0 5 3.0D 5 291.00 <br />3 CLEAR AND GRUB TREE (4" DIA OR GREATER) EA 1 1.0 $ 300.00 5 300.0D <br />4 REMOVE STORM SEWER PIPE LF 12 20.0 5 20.00 5 400.0D <br />5 25" X 15" RCP ARCH SEWER LF B 8.0 5 100.00 $ B00.00 <br />6 28" X 18" RCP ARCH FES W/ TRASHGUARD <br />EA 2 2.0 5 1,000.00 5 2.000.00 <br />7 PLACE BENTONITE AROUND PIPE (MATERIAL SUPPLIED) LF 16 20.D 5 20.0D $ 400.00 <br />B TRENCH STABILIZATION ROCK / PIPE BEDDING LF 20 20.0 5 10.00 $ 200.0D <br />9 AGGREGATE BASE CLASS 5 (6" DEPTH) TN 3D 42.0 5 20.00 $ 640.00 <br />10 BITUMINOUS WEAR COURSE (2" DEPTH) TN 2D 14.0 5 200.00 5 2.600.00 <br />11 CLASS III RIPRAP WI FABRIC CY 2D 20.0 5 100.00 $ 2,000.00 <br />12 SEED / RESTORATION LS 1 1.0 5 600.00 5 800.00 <br />5 11,331.00 <br />SUBTOTAL PROJECT 3 <br />PROJECT 4 - WEST SHADOW LAKE DRIVE CROSSING 1 '1.0 5 500.00 5 500.00 <br />1 MOBILIZATION LS <br />2 CLEAN /OPEN STORM SEWER OUTFALL EA 3 1.D $ 500.00 5 500.0D <br />3 GLEAN STORM SEWERS PIPE LF 400 0.D 5 8.00 5 <br />4 CLEAR AND GRUB TREE (4' DIA OR GREATER) EA 3 2.0 5 200.00 $ 400.00 <br />5 REGRADE DITCH LF 250 41.0 5 25.0D 5 1,02500 <br />6 EROSION CONTROL BLANKET CATEGORY 3 SY 300 35.0 5 2.00 5 70.00 <br />7 SPRINKLED. REPAIR LS 1 D.D 5 50.00 5 <br />B SOD FOR EXISTING YARD AREA SY 200 0.0 5 4.00 5 <br />9 SEED / RESTORATION LS 1 0.3 5 1.000.00 5 250.00 <br />5 2.745.00 <br />SUBTOTAL PROJECT 4 <br />