Laserfiche WebLink
ESTIMATE NO. 3(f) <br />2009 SURFACE WATER MANAGEMENT PROJECT <br />Ci T Y OF LINO LAKES, MINNESOTA <br />TKDA PROJECT NO. 14292.004 <br />ITEM <br />NO. <br />DESCRIPTION <br />PERIOD ENDING: May 2E, 2010 <br />CONTRACT QUANTITY UNIT AMOUNT <br />UNIT QUANTITY TO DATE PRIDE TO DATE <br />PROJECT 6 - STAGECOACH TRAIL <br />1 MOBILIZATION LS 1 1.0 5 500.00 5 500.00 <br />2 EXCAVATION AND GRADING CY 20 7.D 5 50.00 5 350.0D <br />3 4" PE PERFORATED DRAINTILE W/ ROCK AND FABRIC WRAP LF 100 124.0 5 20.00 5 2.450.00 <br />4 INSTALL YARD DRAIN BOX EA 1 2.0 5 1,000.00 5 2,000.00 <br />5 SPRINKLER REPAIR LS 1 D.D $ 50.00 $ <br />6 SOD FOR EXISTING YARD AREA SY 12D 50.0 5 5.00 5 250.00 <br />SUBTOTAL PROJECT 6 5 5,580.00 <br />PROJECT 6 - APOLLO MEADOWS TOWNHOM =_S <br />1 MOBILIZATION LS 1 1.0 5 500.00 5 500.0D <br />2 SALVAGE AND REINSTALL 15" RCP STORM SEWER LF 56 16.0 5 20.00 $ 320.0D <br />3 SALVAGE AND REINSTALL 15" FES EA 1 1.0 5 200.00 $ 200.00 <br />4 CONSTRUCT MH OVER EXISTING 15" STORM SEWER, TYPE 409 EA 1 1.0 5 3.500.00 5 3,500.00 <br />5 CLASS HI RIPRAP W/ FABRIC CY 15 15.0 $ 100.00 5 1,500.00 <br />6 SOD FOR EXISTING YARD AREA SY 1DD 5.0 5 4.00 5 20.00 <br />7 EROSION CONTROL BLANKET CATEGORY 3 SY 300 300.0 6 2.00 5 600.00 <br />8 SEED / RESTORATION LS 1 1.0 $ 500.00 5 500.00 <br />SUBTOTAL PROJECT 6 $ 7,140.00 <br />PROJECT 7 - LOIS LANE <br />1 MOBILIZATION LS 1 1.0 6 500.00 5 500.0D <br />2 CLEAR AND GRUB TREE (4" DIA OR GREATER) EA 4 5.0 5 200.00 5 1,000.00 <br />3 REMOVE 24" APRON EA 1 1.0 5 200.0D 0 200.00 <br />4 REMOVE STORM SEWER PIPE LF 16 16.0 $ 20.00 $ 320.00 <br />5 24" RCP FES W /TRASHGUARD EA 1 1.0 5 1,100.00 5 1,100.00 <br />6 24" RCP STDRM SEWER, CLASS 3 LF 16 16.0 5 80.0D 5 1,250.00 <br />7 CLASS III RIPRAP W/ FABRIC CY 5 5.0 5 150.00 5 750.00 <br />8 EROSION CONTROL BLANKET CATEGORY 3 SY 200 180.0 5 2.00 5 360.00 <br />9 SEED / RESTORATION LS 1 1.0 5 500.00 5 500.00 <br />SUBTOTAL PROJECT 7 5 6,010.00 <br />PROJECTS - BLACKBIRD LANE <br />1 MOBILIZATION LS 1 1.D 5 500.00 5 500.00 <br />2 CLEAN /OPEN STDRM SEWER OUTFALL EA 1 1.0 5 500.00 $ 500.00 <br />3 CLEAN STORM SEWER PIPE LF 5D 50.0 5 10.00 5 500.00 <br />4 CLEAR AND GRUB TREE (4" DIA OR GREATER) EA 2 0.0 5 200.00 5 - <br />5 REGRADE DITCH LF 3D 40.0 5 30.00 $ 1,200.00 <br />6 SPRINKLER REPAIR LS 1 0.0 5 50.00 5 - <br />7 SOD FOR EXISTING YARD AREA SY 75 0.0 5 5.00 6 - <br />8 SEED / RESTORATION LS 1 1.0 5 500.00 $ 500.00 <br />SUBTOTAL PROJECT 8 5 2,200.00 <br />PROJECT 9 - 62ND STREET <br />1 MOBILIZATION LS 1 1.0 5 500.00 5 500.00 <br />2 CLEAN /OPEN STDRM SEWER OUTFALL EA 1 1.D 5 500.00 $ 500.00 <br />3 CLEAN STORM SEWER PIPE LF 170 170.0 $ 10.00 5 1,700.00 <br />4 CLEAR AND GRUB TREE (4" DIA OR GREATER) EA 2 2.0 5 200.00 5 400.00 <br />5 REGRADE DITCH LF 75 76.0 5 25.00 5 1,950.00 <br />6 SEED / RESTORATION LS 1 1.0 5 500.00 5 500..0D <br />SUBTOTAL PROJECT 9 $ 5,550.00 <br />PROJECT 10 - JAMES STREET <br />1 MOBILIZATION LS 1 1.0 5 500.0D $ 500.00 <br />2 CLEAN /OPEN STORM SEWED. OUTFALL EA 1 1.0 5 500.00 5 500.00 <br />3 CLEAN STDRM SEWER PIPE LF 70 70.0 5 10.0D 5 700.00 <br />4 CLEAR AND GRUB TREE (4" DIA OR GREATER) EA 2 2.0 5 200.00 5 400.00 <br />5 REGRADE DITCH LF 30 30.0 5 30.00 6 900.00 <br />6 SEED / RESTORATION LS 1 1.0 5 500.00 5 500.00 <br />SUBTOTAL PROJECT 10 6 3,500.00 <br />• <br />