Laserfiche WebLink
• <br />• <br />• <br />ESTIMATE N. 3(f) <br />2009 SURFACE WATER MANAGEMENT PROJECT <br />CITY OF LIND LAKES, MINNESOTA <br />TKDA, PROJECT N. 14292.004 <br />ITEM <br />NO. <br />DESCRIPTION <br />PERIOD ENDING: May 2E. 2010 <br />CONTRACT QUANTITY UNIT AMOUNT <br />UNIT QUANTITY TO DATE PRICE TD DATE <br />PROJECT 11 - DIANE STREET <br />1 MOBILIZATION LS 1 1.0 $ 500.00 5 500.00 <br />2 CLEAN /OPEN STORM SEWER OUTFACE EA 1 1.D 5 500.00 5 500.00 <br />3 CLEAN STORM SEWER PIPE LF 50 50.0 5 10.00 5 500.00 <br />4 CLEAR AND GRUB TREE (4" DIA OR GREATER) EA 2 2.D 5 200.00 5 400.00 <br />5 REGRADE DITCH LF 30 30.0 5 30.00 5 900.00 <br />6 SEED / RESTORATION LS 1 1.0 5 500.00 $ 500.00 <br />SUBTOTAL PROJECT 11 5 3.300.00 <br />PROJECT 12 - COUNTRY LANE <br />1 MOBILIZATION <br />2 SALVAGE AND REINSTALL SPLIT RAIL FENCE <br />3 CLEAN /OPEN STORM SEWER OUTFALL <br />4 EXCAVATION AND GRADING <br />5 CLEAN STORM SEWER PIPE <br />6 SEED / RESTORATION <br />SUBTOTAL PROJECT 12 <br />SUBTOTAL ESTIMATE NO. 2 <br />LS 1 1.0 5 500.00 5 500.00 <br />LF 30 10.0 $ 10.00 5 100.00 <br />EA 1 1.0 $ 500.00 5 500.00 <br />CY 15 15.0 $ 70.00 $ 1,050.00 <br />LF 200 200.0 $ 10.00 5 2,000.00 <br />LS 1 1.0 5 500.00 5 500.0D <br />5 4,650.00 <br />5 85.486.00 <br />; . '/i 1.5 RLiER•'. 10"' .-' :.,.:..,,»,a,.�5 _. .., _ s :.H, z,: .,:.... ; ..i ,�an: .'�.....,. ..::__..... ._ '. <br />PROJECT 4 - WEST SHADOW LAKE DRIVE CROSSING <br />2 CLEAN /DPEN STORM SEWER OUTFALL <br />5 REGRADE DITCH <br />SUBTOTAL PROJECT 4 <br />PROJECT&- APOLLO MEADOWSTOWNHOMES <br />9 CLEAR AND GRUB TREE (4" DIA OR GREATER) <br />10 COMMON BORROW (FILL OVER PIPE) <br />SUBTOTAL PROJECT 6 <br />PROJECT 7 - LOIS LANE <br />10 CLEAN STORM SEWER PIPE <br />SUBTOTAL PROJECT 7 <br />EA <br />LF <br />1 0_D 5 (500.00) 5 <br />15D D.D 5 (25.00) $ <br />5 <br />EA 2 2.D $ 200.00 $ 400.00 <br />CY 4B 48.0 5 10.00 $ 480.00 <br />$ 860.00 <br />LF 50 50.0 5 10.00 5 500.00 <br />8 500.00 <br />PROJECT 8 - BLACKBIRD LANE <br />9 EROSION CONTROL BLANKET CATEGORY 3 SY 8D 60.0 $ 2.00 5 120.00 <br />SUBTOTAL PROJECT 9 5 120.00 <br />PROJECT 10 - JAMES STREET <br />7 CLASS 111 RIPRAP W/ FABRIC CY 2 2.0 5 150.00 5 300.00 <br />SUBTOTAL PROJECT 10 5 300.00 <br />PROJECT 13 - BIRCH STREET TRENCH DRAIN <br />1 INSTALL TRENCH DRAIN IN CONCRETE LS 1 1.0 5 4,500.00 5 4,500.00 <br />2 CLASS II RIPRAP W/ FABRIC CY 5 5.0 5 100.00 5 500.00 <br />SUBTOTAL PROJECT 13 5 5,000.00 <br />SUBTOTAL CHANGE ORDER NO. 1 <br />5 6.800.00 <br />TOTAL ESTIMATE NQ. 3(f) <br />$ 92,286.00 <br />