Laserfiche WebLink
Construction Estimate <br />Birch Street (CSAH 34) /Ware Road Improvements <br />City of Lino Lakes, Minnesota <br />August 11, 2010 <br />Page 2 <br />• Bituminous removal and sawcut quantities included reconstruction of private driveways <br />where necessary. <br />• The new northbound right -turn lane on Ware Road assumed a 4 -foot expansion of the <br />existing width. Curb removal and replacement were included for this widening. <br />• The regional trail was moved north to maintain the existing boulevard between the trail and <br />the roadway. <br />• A geotechnical investigation was not completed. Geotechnical information from previous <br />projects in this area indicated that the existing soil is a mix of sand, fill material, and organic <br />material. This construction estimate included the removal of 24 inches of topsoil, organic <br />material, and existing soils. <br />• The proposed pavement section was based upon a typical section assumption provided by the <br />County and consisted of 6 inches of bituminous pavement over 6 inches of class 5 aggregate <br />base. A 1 -foot subcut that would be backfilled with select granular material was also <br />included. <br />• The proposed project was expected to be less than 1 acre of disturbed area and will therefore <br />not require a storm water permit from the Rice Creek Watershed District or the MPCA. <br />This construction estimate is based on the above items and is considered preliminary. Preparation <br />of fmal plans will be required to address all of the issues and to obtain a more accurate <br />construction estimate. <br />The total project cost is estimated to be $925,000, including contingencies and right -of -way <br />acquisition. The following contingencies have been added to address other items necessary for <br />construction of the proposed project: <br />• 15% contingency to account for items that will not be quantified until construction plans <br />have been created. <br />• 20% contingency for engineering plans, specifications, and bid package preparation. <br />• 5% contingency for legal, fiscal, and administration duties, which does not include expenses <br />associated with the bond. <br />• 8% contingency for construction services and observation. <br />The attached summary table shows the estimated construction costs for each portion of the <br />proposed project, the Birch Street improvements and the Sioux Drive connection, followed by <br />the right -of -way costs and contingencies. Itemized construction estimates are then attached for <br />each project segment. All unit prices and cost estimates reflect construction in year 2012. <br />