Laserfiche WebLink
BUFFERYARD / BERM PLANTING SCHEDULE <br />SYM' KEY COMMON NAME BOTANICAL NAME SIZE <br />® BH 'Black Hills' Spruce Picea glauca densata'B.H' <br />• CS Cutleaf Staghorn Sumac Rhus typhina 'Laciniata' <br />• 1 FG 'Fallgold' Ash Fraxinus nigra'Fallgold' <br />• I FW French Pussy_Willow Salix caprea <br />• GA 'Summit' Green Ash Fraxinus pennsylvanica'Summit' <br />NP Norway (Red) Pine Pinus resinosa <br />O NW 'Niobe' Weeping Willow Salix alba'Tristis' <br />is PK Northern Pin Oak Quercus ellipsoidalis <br />L • QA ' Quaking Aspen Populus tremuloides <br />• RT '!santi Redtwig Dogwood Comus sedcea'!santi' <br />• SM 'Green Mountain' Sugar Maple Acer saccharum'Green Mountain' <br />TOTALS - TREES /SHRUBS <br />QTY. • NOTES <br />8 Fully branched to ground I <br />#5 cont. 17 _ Plant 10' on center <br />2" BB 9 Single, straight leader I <br />#5 cont. 15 Multi -stem <br />2" BB 3 1 Single, straight leader <br />5' BB 11 Fully branched to ground <br />2" BB 8 Single leader I <br />2" BB 2 j Single, straight leader <br />#25 cont. 10 Single leader <br />#5 cont. 39 Plant 8' on center I <br />2" BB 3 Single, straight leader <br />54/71 <br />PARKING LOT - TREE PLANTING SCHEDULE <br />i SYM KEY I COMMON NAME BOTANICAL NAME <br />® i BH ; 'Black Hills' Spruce Picea glauca densata'B.H' <br />• i PK j Northern Pin Oak Quercus ellipsoidalis <br />r 41,--i RD Red Oak Quercus rubra <br />I • 'i RM I 'Autumn Spire' Red Maple Acer rubrum'Autumn Spire' <br />1 • j SS i 'Spring Snow' Crabapple Malus Spring Snow' <br />TOTAL <br />SIZE ! QTY. NOTES <br />6' BB ! 3 Fully branched to ground <br />2" BB I 9 Single, straight leader <br />2" B8 1 2 Sing straight leader <br />2" BB I 3 Single, straight leader <br />1.5" BB I 4 Single leader <br />21 <br />Notes. <br />• Nand loosen loots of t...p¢ reed maferal. <br />• Resaa Nan from lop of BBB 4400. <br />• warty boMm and sods snide pro d denting. <br />•• Use waling amp to Whiled <br />•!Iis the Coated. , OOPS le Slake.d4. nceeve. Bo Contractors <br />tessmnblelot manwinngtrees in a plumb poll t140400ullbe <br />ready seed. <br />Typical Deciduous Tree Planting Detail <br />Not 00 Scale <br />EA TD•8E SEEDED WITH <br />TY,A1OPROVED NATIVE, <br />LAND SEED MIX <br />20 40 <br />SCALE r - 40 <br />Double wand 14 gates .ha. oe <br />poteyepllene m pNremylene s040, <br />44md,112 woeamine Punk <br />Interred to first branch <br />Cd wiriest ink pre bides away <br />Lambe O'meal am slate lop of <br />WWI lush.* maim Bade <br />SNeddel herTeod nee <br />g 4 de* <br />Graudm4r 1see sit adscape <br />pbnblype) <br />Rodbell <br />Bedfpludh eailbg inedemus <br />Set 40040 on undisturbed <br />subs ede <br />05004000 peers04 <br />80 <br />AREA TO BE SEEDED WITH <br />CITY APPROVED NATIVE, <br />UPLAND SEED MIX <br />s�� 'Fiee�x4ua em® � ��Ae°�s. <br />Notes: <br />• Remove burlap twine of BO maeal. <br />• Scarily bottom and Pies oI Me cot to owing <br />'Weer kee. lamp to remove ar pocees. <br />• Use ensung magmas sod es Paced soli <br />• Co not dace mulch in 400104 in le me dmk. <br />• It IS DA 00 0 110 a40 wsl5Ae 4tts', hara0e. ao Corr0orn <br />rsponede lot mmenirg Res in a plumb posim.eago.. <br />evenly perctl. <br />Typical Coniferous Tree Planting Detail <br />M 14 440450 e <br />Pdprop4lare of pdtsethykre <br />step, 40 rod. 1 VT,. nye) <br />Cuenealma, pull bap <br />stray fronds olmdball and <br />eau top Mrwb40:E00v00 <br />e.mg grade <br />Shreddedbad000dnukh <br />9002,10 <br />eraindmaatuesr landscape <br />Rodbell <br />Beafidwei early?Mosso. <br />sort <br />Bel weal on u400t4t d <br />aagaee <br />Wasted 00040 e <br />Not to Scale <br />Notes: <br />rvRd Maimed mat. <br />Remove Neap Pm Nap of BO mama. <br />•Sat won, meo.ses oimie mRb ones. remove orpoutts <br />WAD DAD Use rAeii0Wmpeipl zbo0:1 wi torenuo <br />no0omw I1<e sue ardrmpe pen <br />MIWe) <br />Typical Shrub Planting Detail <br />Enmoeptonwdebaded PADUA <br />DRAW. ROD. <br />Not to Scale <br />PLANTING NOTES: <br />Contractor shalt provide a one year guarantee on all plan! materials. The guarantee begins on the <br />date of the landscape 010014004 or Owner's written acceptance of the initial planting. Replacement <br />plant materials shall also nave a one year guarantee comments upon planting. <br />The Owner shall he responsible for maintenance after the Owner's acceptance of the wore. <br />All plants are to be northern grown and hardy. <br />Plants to be installed as per standard PAN planting practices. <br />Use existing, indigenous soil for 01ck011 material In tree planting holes and pulverized topsoil tor <br />back0ll malarial material in shrub planting holes. see planting delaes for depths. Use a Sell mN of <br />1 -1 -1 (pulverized 40400 sand, peal moss) for perennial beds, metalled at a minimum depth of 12•. <br />It is are Contractor's responsibility to verify lesions with all utilities prior to any site work including: <br />grading, installation of plants and irrigation system. <br />All sod areas shad be brgale4 with an automated underground sprinkler system. All additl00al <br />landscaped areas shall be inigaled with ether spray heads or with leaky pipe% as appropriate to the <br />plant bpd Seeded areas do not require trdgation. <br />Staking of trees Is optional elthough the Lanscape Contactor Is responsible to reposldon any trees <br />that are not plumb within the one year warranty pNgd. <br />Wrap all smooth-barked trees and fasten at top and bottom. Remove by Apr 1. <br />Open lop of burlap on BB materials, remove pot from potted plants and gently loosen mots it needed. <br />Prune plants as necessary per standard nursery pacers. <br />Plants shall be immediately planted upon arrlv-41 at slue. Properly heel In material if necessary <br />(temporary only). <br />All disturbed areas are to be either sodded or seeded as noted. Sod shad be northern grown and <br />hardy. A 4• (depth) layer of topsoil shall be installed In all areas to be sodded. <br />Planting beds for shrubs are perennials shall have 5.5 (vertical) Mack poly edging (commercial <br />grade). weed barrier fabric or poly banter and mulch. The edging shall be placed and slaked with <br />smooth curves. See landscape plan(s) for depth and ye r 1100. <br />Shredded hardwood mulch shad be prov0ed around all installed trees al a depth of 4• and a diameter <br />of4'Men.). <br />SOD / SEEDING 8 IRRIGATION NOTES: <br />• All disturbed areas are to be either sodded Or seeded es noted on sae landscape plan (s). <br />• Sod shad be northern grown and hardy. A 4• (depth) layer of pulverized topsoil shall be incorporated <br />into all areas to be sodded by rolotiUing and grading smooth. <br />• Sod areas and landscaped areas (including berms) are to be irrigated with an automated irrigation <br />system An •As -Boil" Ilan shall be prowde0 to the Owner at completion of system installation. <br />• Areas disturbed by site work/grading (berms and level areas) shall be seeded with Lino Lakes, City e designated native seed mix for upland soils. <br />Pond edges (4:1 slopes) shall be seeded with Lino Lakes, City designated native seed mu for <br />wetland soils. <br />• Seeded areas must be installed and maintained to maturity (3-5 veers) by a Ciro aooroved <br />9 <br />0 <br />J F- <br />Ott <br />O <br />z <br />0 <br />Z <br />z LL1 Y <br />� � J <br />00 <br />1- Z <br />� J <br />< t� <br />F— J <br />00 <br />DESIGNED <br />DCCK <br />SITE LANDSCAPE PLAN <br />DRAPAI <br />CCK <br />PROJECT t <br />1650.001 <br />DATE <br />11/10/05 <br />SHEET Y <br />C1.2 <br />