Laserfiche WebLink
MAR -.1 2 -97 WED 1 4: 34 ALPHA V I DEO <br />City of Lino Lakes <br />Council Chambers Proposal <br />March 12, 1997 <br />To: <br />City of Lino Lakes <br />Daniel Tesch <br />1189 Main Street <br />Lino Lakes, MN 55014 <br />From: <br />Alpha Video and Audio, Inc. <br />Jeffrey Volk <br />7711 Computer Avenue <br />Edina, MN 55435 <br />612- 896 -9898 extension 484 (ph) <br />612 -896 -9899 (fax) <br />jeffvGatphavideo.com (email) <br />A: Phase ONE (Video and Audio Systems) <br />Qty Description <br />3 WVCS604 Camera Units <br />1 WVCU151 Camera System Controller <br />1 WJSW208 Sequential Camera Switcher <br />1 WJMX50 AN Production Switcher <br />2 TMA9U 9' Color Program/Preview Monitor <br />1 1X5 Composite Video Distribution Amplifier <br />1 SC4 /SM58 Handheld Wireless Microphone System <br />2 SCM810 IntelliMix automated Microphone Mixer <br />2 RKC800 XLR Adapter <br />5 ECM44B Lapel Microphone <br />1 1X5 Balanced XLR Audio Distribution Amplifier <br />1 Custom installation: Phase One Labor and Materials* <br />P - Ei 2 <br />7711 Computer Avenue <br />Edina, MN 56435 -5494 <br />(612) 896 -9898 <br />FAX (612) 896 9899 <br />B: Phase TWO (Video and Audio Systems) <br />qty Description <br />1 RK9UM9 Rackmount Kit <br />1 SRS360U SVHS Player /Recorder <br />1 RK360U Rackmount Kit <br />1 TM2000 Character Generator <br />1 AVP2OU Visual Presenter <br />1 AV27720 27' Color Television <br />1 Jumbo Mount for AV27720 <br />1 Dual Bay 56' Custom Equipment Rack -Pre Assembled <br />1 Custom Installation: Phase Two Labor and Materials' <br />C: Sub - Total: Phases ONE and TWO <br />D: Tax (6.5°x) <br />E: System Total <br />$3,400.00 <br />1,075.00 <br />275 -00 <br />4,270.00 <br />468.00 <br />630.00 <br />800.00 <br />1,350.00 <br />225.00 <br />225.00 <br />389.00 <br />4,000.00 <br />110.00 <br />1,035.00 <br />80.00 <br />505.00 <br />1,125.00 <br />465.00 <br />250 -00 <br />2,875.00 <br />2,500.00 <br />$28,000.00 <br />$10,200.00 <br />1,075.00 <br />275.00 <br />4,270.00 <br />938.00 <br />630.00 <br />800.00 <br />2,700 -00 <br />450.00 <br />1,125 -00 <br />389.00 <br />4,000.00 <br />$8,945.00 <br />110.00 <br />1,035.00 <br />80.00 <br />505.00 <br />1,125.00 <br />465.00 <br />250.00 <br />2,875.00 <br />2,500.00 <br />$36,945.00" <br />2,401.43 <br />$39,346.43 <br />F: System Notes: <br />Installation cost is an estimate and includes all materials and labor necessary to physically install, wire and <br />configure all equipment property. It DOES NOT include moving any existing equipment or any additional electrical <br />work to provide proper power. <br />" Alpha Video and The Associates Leasing have municipal financing programs available that would allow you to <br />complete Phases ONE and TWO of this project at the same time. Please see the enclosed proposal for an <br />estimate of several leasing /financing options. <br />