My WebLink
|
Help
|
About
|
Sign Out
Home
Search
01/11/2006 P&Z Minutes
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Minutes
>
2006
>
01/11/2006 P&Z Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2014 4:13:34 PM
Creation date
4/7/2014 4:13:26 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Minutes
Meeting Date
01/11/2006
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Planning&ZoningBoard December14,2005 <br />Page 2 <br />APPROVEDMINUTES <br />December14,2005 <br />Mr.TrallemadeaMOTIONtoapprovetheDecember14,2005Minutesandwas <br />supportedbyMr.Pogalz.Motioncarried6 -0.Mr.Rootabstained. <br />IV.OPENMIKE <br />ChairRaffertydeclaredOpenMikeat6:40p.m. <br />TherewasnoonepresentforOpenMike. <br />Mr.PogalzmadeaMOTIONtocloseOpenMikeat6:41p.m.,andwassupportedbyMr. <br />Tralle.Motioncarried7 -0. <br />V.ACTIONITEMS <br />A.CONTINUED:PlannedUnitDevelopmentFi nalPlanfortheChainofLakes <br />YMCA,7690VillageDrive <br />ThisitemwascontinuedfromtheDecember14,2005meeting. <br />Mr.Bengtsonpresentedthestaffreport. <br />Mr.Raffertyquestionedanareaofadarkbandaroundthebottominthecolorelevation. <br />Mr.Bengt sonclarifiedthattheareawasarepresentationofacolorchangeandadifferent <br />material. <br />Mr.Bengtsonexplainedthatadifferentproductwouldneedtobeusedonthepenthouse <br />areaforventilationpurposes.Mr.Raffertyaskedabouttheheightofthepe nthouse.Mr. <br />Bengtsonrepliedthat,althoughthepenthouseelevationswerenotcalledout,thebuilding <br />heightiswithintheguidelinesandallowsplentyofroomtoscreenequipmenteffectively. <br />Mr.Tralleaskediftherenderingshownwasatruerepresentationofcolorsfortheprecast <br />areas.Mr.Bengtsonrepliedthatcolorswherenotyetlockedin.Optionsareshownandthe <br />architectwouldpresentexamplesofcoloroptions,aswellastheproduct itself. <br />Mr.Nelsonaskediftheproposedparkingisforthefirstphaseonly,ordiditincludethe <br />secondphase.Mr.Bengtsonrepliedthattheproposedparkingisbasedonfullbuildout <br />basedonanestimateofthesecondphase,howeverthismaychangewi thconstruction. <br />176parkingspotsarerequiredandprovidedforatthistime. <br />Mr.Hydenaskedforanexplanationoftheproposedinnovativestormwaterinfiltration <br />tanks.Mr.Grochalaexplainedthatthesearepartofthecity’spublicimprovement <br />project forthisareaandhavealreadybeenconstructed.Mr.Grochalaexplainedthe <br />stormwatersystemlocatedundertheparkinglotincludesaPVCchamberwhich <br />increasesinfiltration&stormwaterholdingcapacity.
The URL can be used to link to this page
Your browser does not support the video tag.