My WebLink
|
Help
|
About
|
Sign Out
Home
Search
10/23/2006 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2006
>
10/23/2006 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2014 1:00:39 PM
Creation date
4/29/2014 11:24:24 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
10/23/2006
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ESTIMATE NO. 4 (Final) <br />2005 SURFACE WATER MANAGEMENT PROJECTS <br />IVOF LINO LAKES, MINNESOTA <br />A PROJECT NO. 13475.000 <br />PERIOD ENDING: September 28, 2006 <br />ITEM CONTRACT QUANTITY UNIT AMOUNT <br />NO. DESCRIPTION UNIT QUANTITY TO DATE PRICE TO DATE <br />A BLACKBIRD LANE (PROJECT LOCATION 1 ) <br />1 MOBILIZATION LS 1.0 1.0 $ 1 ,000.00 $ 1,000.00 <br />2 CLEAN STORM SEWER PIPE (12' - 24" DIA.) LF 90.0 90.0 $ 17.60 $ 1,584.00 <br />3 CLEAN /OPEN STORM SEWER OUTFALL EA 2.0 2.0 $ 700.00 $ 1,400.00 <br />4 CLEAN CATCH BASIN /MANHOLE STRUCTURE EA 2.0 2.0 $ 88.00 $ 176.00 <br />5 DITCH EXCAVATION CY 25.0 5.0 $ 20.00 $ 100.00 <br />6 TRAFFIC CONTROL LS 1.0 1.0 $ 300.00 $ 300.00 <br />7 SEEDING AND RESTORATION LS 1.0 - $ 625.00 $ <br />8 EROSION CONTROL LS 1.0 $ 500.00 $ - <br />SUBTOTAL PROJECT LOCATION 1 $ 4,560.00 <br />B EAST RONDEAU LAKE ROAD (PROJECT LOCATION 2 ) <br />1 MOBILIZATION LS 1.0 1.0 $ 1,000.00 $ 1,000.00 <br />2 REMOVE BITUMINOUS PAVEMENT SY 25.0 27.0 $ 7.00 $ 189.00 <br />3 COMMON EXCAVATION (STREET AND PIPE CULVERT) CY 7.0 $ 30.00 $ <br />4 12" RCP STORM SEWER CL. 5 LF 40.0 32.0 $ 34.00 $ 1,088.00 <br />5 12" RCP F.E.S. WITH TRASH GUARD EA 2.0 2.0 $ 650.00 $ 1,300.00 <br />6 3" BITUMINOUS PAVEMENT TN 5.0 4.0 $ 160.00 $ 640.00 <br />7 AGGREGATE BASE CLASS 5 (100% CRUSHED) TN 10.0 8.0 $ 30.00 $ 240.00 <br />8 DITCH EXCAVATION CY 25.0 5.0 $ 20.00 $ 100.00 <br />9 TRAFFIC CONTROL LS 1.0 1.0 $ 300.00 $ 300.00 <br />10 SEEDING AND RESTORATION LS 1.0 1.0 $ 500.00 $ 500.00 <br />0 EROSION CONTROL LS 1.0 - $ 300.00 $ <br />SUBTOTAL PROJECT LOCATION 2 $ 5,357.00 <br />C OTTER LAKE ROAD - REPAIR WASHOUT AND INSTALL PIPE (PROJECT LOCATION 3 ) <br />1 MOBILIZATION LS 1.0 1.0 $ 1,000.00 $ 1,000.00 <br />2 COMMON BORROW CY 20.0 48.0 $ 22.00 $ 1,056.00 <br />3 AGGREGATE BASE CLASS 5 (100% CRUSHED) TN 12.0 12.0 $ 32.00 $ 384.00 <br />4 SEEDING AND RESTORATION LS 1.0 1.0 $ 500.00 $ 500.00 <br />5 EROSION CONTROL LS 1.0 - $ 300.00 $ <br />SUBTOTAL PROJECT LOCATION 3 $ 2,940.00 <br />D OTTER LAKE ROAD- CULVERT REPAIR AND PIPE CLEANING (PROJECT LOCATION 4 <br />1 MOBILIZATION LS 1.0 1.0 $ 1,000.00 $ 1,000.00 <br />2 CLEAN STORM SEWER PIPE (12' - 24" DIA.) LF 210.0 $ 7.50 $ <br />3 REMOVE PIPE LF 10.0 10.0 $ 12.00 $ 120.00 <br />4 15" CM PIPE CULVERT LF 10.0 10.0 $ 25.00 $ 250.00 <br />5 CONNECT TO EXISTING PIPE EA 2.0 2.0 $ 200.00 $ 400.00 <br />6 3" BITUMINOUS PAVEMENT (LVWE45030B) PATCHING TN 4.0 3.0 $ 170.00 $ 510.00 <br />7 DITCH EXCAVATION CY 5.0 3.0 $ 20.00 $ 60.00 <br />8 TRAFFIC CONTROL LS 1.0 1.0 $ 200.00 $ 200.00 <br />9 SEEDING AND RESTORATION LS 1.0 1.0 $ 400.00 $ 400.00 <br />10 EROSION CONTROL LS 1.0 - $ 200.00 $ <br />SUBTOTAL PROJECT LOCATION 4 $ 2,940.00 <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.