Laserfiche WebLink
ESTIMATE NO. 4 (Final) <br />2005 SURFACE WATER MANAGEMENT PROJECTS <br />ITY OF LINO LAKES, MINNESOTA <br />DA PROJECT NO. 13475.000 <br />PERIOD ENDING: September 28, 2006 <br />ITEM CONTRACT QUANTITY UNIT AMOUNT <br />NO. DESCRIPTION UNIT QUANTITY TO DATE PRICE TO DATE <br />E LEONARD AVENUE (PROJECT LOCATION 5 ) <br />1 MOBILIZATION LS 1.0 1.0 $ 1,000.00 $ 1,000.00 <br />2 CLEAN STORM SEWER PIPE (12' - 24" DIA.) LF 70.0 70.0 $ 15.00 $ 1,050.00 <br />3 CLEAN /OPEN STORM SEWER OUTFALL EA 1.0 1.0 $ 650.00 $ 650.00 <br />4 CLEAN CATCH BASIN /MANHOLE STRUCTURE EA 1.0 1.0 $ 132.00 $ 132.00 <br />5 CLEAR AND GRUB TREE EA 8.0 $ 150.00 $ <br />6 DITCH EXCAVATION CY 15.0 15.0 $ 18.00 $ 270.00 <br />7 FURNISH AND INSTALL CATCH BASIN (TYPE 402) EA 1.0 1.0 $ 1,200.00 $ 1,200.00 <br />8 CONSTRUCT CATCH BASIN OVER EXISTING PIPE EA 1.0 1.0 $ 1,400.00 $ 1,400.00 <br />9 RIP RAP (CLASS II) CY 5.0 - $ 55.00 $ <br />10 TRAFFIC CONTROL LS 1.0 1.0 $ 300.00 $ 300.00 <br />11 SEEDING AND RESTORATION LS 1.0 1.0 $ 300.00 $ 300.00 <br />12 EROSION CONTROL LS 1.0 - $ 250.00 $ - <br />SUBTOTAL PROJECT LOCATION 5 $ 6,302.00 <br />F CLEARWATER CREEK (PROJECT LOCATION 6 ) <br />1 MOBILIZATION LS 1.0 1.0 $ 1,200.00 $ 1,200.00 <br />2 6" PERFORATED PE PIPE WITH WRAP LF 280.0 280.0 $ 40.00 $ 11,200.00 <br />3 INSTALL 6" CLEANOUT EA 3.0 3.0 $ 90.00 $ 270.00 <br />4 CONNECT TO EXISTING CATCH BASIN EA 1.0 1.0 $ 500.00 $ 500.00 <br />5 SELECT TOPSOIL BORROW (CV) CY 40.0 20.0 $ 15.00 $ 300.00 <br />6 SODDING AND RESTORATION SY 400.0 518.0 $ 8.00 $ 4,144.00 <br />7 EROSION CONTROL LS 1.0 - $ 70.00 $ - <br />SUBTOTAL PROJECT LOCATION 6 $ 17,614.00 <br />G TRAPPERS CROSSING (PROJECT LOCATION 7 ) <br />1 MOBILIZATION LS 1.0 1.0 $ 2,000.00 $ 2,000.00 <br />2 6" PERFORATED PE PIPE WITH WRAP LF 500.0 450.0 $ 40.00 $ 18,000.00 <br />3 INSTALL 6" CLEANOUT EA 4.0 8.0 $ 90.00 $ 720.00 <br />4 SELECT TOPSOIL BORROW (CV) CY 60.0 24.0 $ 15.00 $ 360.00 <br />5 SODDING AND RESTORATION SY 1,000.0 857.0 $ 7.00 $ 5,999.00 <br />6 EROSION CONTROL LS 1.0 - $ 100.00 $ <br />SUBTOTAL PROJECT LOCATION 7 $ 27,079.00 <br />TOTAL ESTIMATE NO. 4 (FINAL) $ 66,792.00 <br />• <br />