My WebLink
|
Help
|
About
|
Sign Out
Home
Search
01/08/2014 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2014
>
01/08/2014 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2022 12:12:55 PM
Creation date
4/29/2014 1:56:39 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
01/08/2014
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. Conservation easement language shall include allowance for construction of trails, <br />parks, storm water management facilities, retaining walls, etc. <br />6. Conservation easement shall be drafted by the developer and submitted to the City <br />for review and approval. <br />7. Comments/Revision to Sheet CO, Title Sheet: <br />a. Old Birch Street shall be renamed Pheasant Run South as required by <br />emergency services. <br />b. Pine Cone Court shall be renamed to eliminate multiple uses of "Pine" <br />throughout the City. <br />8. Comments/Revision to Sheet C1-1 & C1-2, Preliminary Grading, Drainage & <br />Erosion Plan <br />a. Plan sheet notes sidewalk and bituminous trail by others. Sidewalk and <br />trail shall be installed by developer. <br />b. Sidewalk south of Black Berry Court shall be reviewed by the City <br />Engineer to determine if 8 foot wide bituminous trail is feasible. <br />c. A pedestrian access ramp shall be installed south of Lot 15, Block I to <br />provide access to the sidewalk/ trail from Black Berry Court. <br />d. A cost estimate for the trail construction shall be provided. <br />9. Comments/Revision to Sheet I of 9, Certificate of Survey with Resource <br />Inventory: <br />a. The applicant shall submit a Letter of Map Revision to FEMA for review <br />and approval. <br />b. The flood elevation shall be determined now during platting process. <br />c. Letter of Map Revision shall be submitted after site grading. <br />d. It may be possible that some lots will require flood insurance until LOMR <br />approved or City may not issue building permits on lots impacted by <br />floodplain until after LOMR approved. <br />10. Comments/Revisions to Sheet 4 and 5 of 9, Preliminary Plat: <br />a. Lots 14 and 15, Block 6 shall not extend into the wetland. <br />b. Lot 15, Block 6 shall have PUD flexibility to allow the rear setback to <br />extend to the conservation easement. <br />c. Lot 1, Block 3 shall be revised so the retaining wall is located entirely <br />within the lot and outside of the standard drainage and utility easement. <br />d. Lot 1, Block 2 shall not extend into the wetland. <br />e. Lot 1, Block 2 shall have PUD flexibility to allow the rear setback to <br />extend to the conservation easement. <br />11. Comments/Revisions to Sheet 7 and 8, Preliminary Landscape and Planting Plan: <br />a. The landscape plan shall include Open Area Landscape calculations as <br />required per ordinance. <br />b. Planting schedule (symbols, quantities, common and botanical names and <br />sizes of plant materials) and Planting Detail shall be included for all Open <br />Area, Buffer, Boulevard and Tree Preservation and Mitigation plantings. <br />E <br />
The URL can be used to link to this page
Your browser does not support the video tag.