Laserfiche WebLink
• <br />2008 <br />2008 Surface Water Management Project <br />This project consists of the annual maintenance of the City's storm water =- 'yance <br />system. Under the National Pollutant Discharge Elimination System (NP < `k` Phase II <br />permit the City is required to inspect 20% of its stormwater manage cture <br />and repair all identified deficiencies. The purpose of the project is r� ,.'.age <br />and capacity in the city's ditches and ponds and insure water q tandar <br />Improvements include storm pipe, ditch and pond cleaning we as pipe an et. <br />basin replacements. <br />The estimated project cost is $170,000. The projec oposed to be funded by the <br />City's general fund. <br />2008 Street Sealcoat and Overlay Project <br />This project consists of the annual maintenance of the City <br />reserve and len <br />ent Managem <br />s of mum <br />of the project is in a cost effective m <br />City Streets in accordance with the <br />include crack sealing, seal coating an <br />system. The purpose <br />e life expectancy of <br />. Improvements <br />treets <br />The estimated project cost is $385,000 <br />City's general fund. <br />The City u ently wor �� Lity o� "oreview, Ramsey County and Anoka <br />County as ' . :�� Tate improvements to the intersection. <br />the � ' �� � �� � ��� � Via.- <br />Proposed im ould inclu. - gnalization, turn lane construction and <br />zation. <br />e est oject expected to exceed $1,000,000. The City's share of the <br />project is pr .P to be in part, by Municipal State Aid ($100,000). Additional <br />funding source r � E f ding sp: al assessments from new development will be considered. <br />Cedar Street Rec« ction <br />• <br />.roject &" s the reconstruction of Cedar Street from Otter Lake Road to a point <br />a a� u a , `;100 feet east. This project was originally contemplated with the <br />dev_ f the Clearwater Creek residential subdivision and the Clearwater Creek <br />Busin k. <br />