Laserfiche WebLink
The estimated project cost is approximately $293,160. The project is proposed to be <br />funded from special assessments previously collected and Surface Water Management <br />funds. <br />Water Tower No. 1 Painting <br />Water Tower No. 1 is located in the Apollo Business Park. The pr * volve the <br />painting of the exterior shell of the facility <br />The estimated project cost is approximately $300,000. The propose <br />funded from the Water Enterprise Fund. <br />Sanitary Sewer Rehabilitation (Lakes Addition) <br />This project involves the relining of the sanitary `<'- system p `s Within the Lakes <br />Addition residential area The project is intended a ent and infiltration of <br />ground water into the sanitary sewer system. <br />The estimated project cost is approx tely $130,000. Tho ct is proposed to be <br />funded from the Sanitary Sewer Ent <br />• <br />• <br />• <br />