|
f
<br />2
<br />0
<br />2
<br />0
<br />0
<br />0
<br />a
<br />z
<br />0
<br />W
<br />0
<br />C
<br />n
<br />f
<br />J
<br />a
<br />Y
<br />J ¢ e
<br />O W
<br />U m n
<br />•
<br />41.6449.11044,
<br />N44w19444,
<br />$ 11,888,240
<br />$ 180.000
<br />E 422,500
<br />$ 1,400,350
<br />200,000
<br />$
<br />$
<br />a
<br />$
<br />$
<br />$
<br />$
<br />w 4,4,4,4,4,4,
<br />4,wMww4,ww.m
<br />"°
<br />w H.
<br />4OJECT COSTS
<br />Sanitary Other
<br />49•4,4/40449,1114w49 4,119
<br />4,44444.4.4.
<br />0
<br />4944w4444w44119
<br />4, 49
<br />w64wwwww
<br />$
<br />81,399,000
<br />w 4, M w M w w w M N
<br />`.47: g
<br />w w w w w w w
<br />4464 M w N w w w
<br />o
<br />w w N w w 4,
<br />$
<br />a 300,000
<br />300,000
<br />• 0 0 0
<br />o °o
<br />e °."'. u°, v'OO
<br />644,49.4,4,444,40 4,
<br />230 580
<br />$
<br />$ 300,000
<br />•• 0 00 0••
<br />n o °o
<br />g
<br />r, vo °o
<br />Mw wwwMww
<br />a
<br />E
<br />E 200,000
<br />835 000
<br />$ 1,035,000
<br />•
<br />E
<br />$ 1,145,575
<br />E 404,250
<br />Storm
<br />°0 =
<br />4, 4,64 w w w MMM
<br />0 $
<br />w
<br />4, 49 44 w 4,w
<br />E o
<br />4, w m
<br />N NMww4,wMM64Mw4,4,wMwwM4,
<br />'2.
<br />m .- n
<br />E.,
<br />v- m
<br />1 $ 1,232,400
<br />$2,918,030
<br />n M
<br />a
<br />w M w M w w w 4, N 1.464.064
<br />o° Om
<br />° ni
<br />p N
<br />0;
<br />M w N
<br />°n m
<br />13'
<br />C O
<br />M
<br />M 64 w M w w 4,
<br />7.297,130
<br />-
<br />$ 422,500
<br />$ 832,850
<br />E
<br />N N
<br />N 4D
<br />M w w M 64 N 4,
<br />PROJECT
<br />2007 Surface Water Management Project'
<br />2007 Seal Coat and Overlay Protect
<br />Lake /l35W Improvements
<br />CSAH 14/8 (Main Street) E of 35E
<br />Water Treatment Plant Feasibility Study
<br />CSAH 14 - 135W In 135E (city share)
<br />1Woodddge Estates Trunk Watermaln ExI
<br />Lift Station No 8 Upgrede
<br />2009 Reconstruction Feasibility Study
<br />RCWD Resource Management Plan'
<br />rule'
<br />2008 Surface Water Management Project
<br />2008 Seel Coat end Overlay Project
<br />CSAH 49/J Intersection Recon (City Share est.)
<br />Cedar Street
<br />Weler Tower No. 1 Painting
<br />Sanitary Sewer Rehab (Lakes Addition)
<br />Total
<br />2009 Surface Water Management Project
<br />2009 Seal Coat and Overlay Protect
<br />2009 /Street Reconstruction'
<br />Well No I3 b Pumphouse
<br />Trunk Water Mein Imp. SOD 10 Aqua
<br />2011 Reconstuction Feasibility Study
<br />CSAH 23/14 Intersection Recon (City Share est.)
<br />CSAH 14/1 -35E Interchange (City Share esL)
<br />rolai
<br />2010 Surface Water Management Project
<br />2010 Seal Coal end Overlay Project
<br />Holly Dr (Holly Ct to Cnty .1 (MSA)
<br />Trunk Welermeln Park Ct to Mershon Lane
<br />500K !al Ground Slor= !e/Trunk Wlr Mu
<br />Total
<br />2011 Surface Water Management Project
<br />2011 Seal Coel and Overlay Project
<br />2011 Street Reconstruction
<br />Water Main from Well 3 10 Ground Storage
<br />12th Ave (Birch to Hotly Dr) (MSA)
<br />Lin Station No. 4 Expansion
<br />r 010
<br />011 TOTALS
<br />N
<br />N
<br />to
<br />N 4,
<br />N N
<br />b
<br />m'
<br />N N
<br />b
<br />of
<br />1 N
<br />•
<br />
|