Laserfiche WebLink
2011 <br />General: Improvements scheduled for 2011 include the annual street maintenance and <br />surface water management projects as well as trunk utility and roadway impro = ents. <br />Of significant note is the planned reconstruction of 12th Avenue from Bir et to <br />Holly Drive. This project is dependent on the availability of Municipal S d Funds <br />and special assessments to benefiting property owners. Addition 11 Street <br />Reconstruction Project is programmed. This project includes the reco streets <br />within the Shenandoah Area and LaMotte Addition residential Th t is <br />dependent on majority consent of benefited property o .rs" d voter ae =t - Wd <br />referendum. <br />1. 2011 Surface Water Management Project <br />2. 2011 Street Sealcoat and Overlay Project <br />3. 2011 Street Reconstruction Project (`, .doah <br />Residential areas). <br />4. Water Main from Well No. 3 to Ground Storage <br />5. 12th Avenue Reconstruction (Birch Street to Holly <br />6. Lift Station No. 4 Expansion. <br />otte Addition <br />• <br />• <br />• <br />