My WebLink
|
Help
|
About
|
Sign Out
Home
Search
01/14/2008 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2008
>
01/14/2008 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2014 2:51:52 PM
Creation date
5/2/2014 9:52:06 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
01/14/2008
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
245
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />2010 -2012 <br />Projects identified for the planning period 2009 -2011 include State Aid Street <br />reconstruction, annual Surface Water Management projects, street reconstruction and <br />utility infrastructure improvements. Projects will be evaluated in more detail in 2008 and <br />2009. Estimated improvement costs and proposed funding sources are included on the <br />Street and Utility Capital Improvement Program Summary spreadsheet. A general <br />overview of major projects is included with each year. <br />2010 <br />Overview: Improvements scheduled for 2009 include the annual street maintenance <br />and surface water management projects as well as trunk utility and roadway <br />improvements. Of significant note is the planned reconstruction of Holly Drive from <br />Holly Court to County Road J This project is dependent on the availability of Municipal <br />State Aid Funds and special assessment to benefiting property owners. Additionally, the <br />program includes the construction of a 1.5 million gallon ground storage facility to <br />supplement the City's two, 1 million gallon elevated water towers. <br />1. 2010 Surface Water Management Project <br />2. 2010 Street Sealcoat and Overlay Project <br />3. Holly Drive (Holly Ct. to Cnty J) <br />4. Civic Center Parking Lot Expansion <br />6. 2011 Street Reconstruction Feasibility Study <br />7. Water Pressure Booster Station <br />8. Well No. 7 <br />9. 1.5 Million Gallon Water Ground Storage <br />2011 <br />Improvements scheduled for 2011 include the annual street maintenance and surface <br />water management projects as well as trunk utility and roadway improvements. Of <br />significant note is the planned reconstruction of 12th Avenue from Birch Street to from <br />Holly Drive. This project is dependent on the availability of Municipal State Aid Funds <br />and special assessment to benefiting property owners. Additionally, the 2011 Street <br />Reconstruction Project is programmed. This project includes the reconstruction of streets <br />within the Shenandoah Area and LaMotte Addition residential areas. The project is <br />dependent on majority consent of benefited property owners and voter approved <br />referendum. <br />1. 2011 Surface Water Management Project <br />2. 2011 Street Sealcoat and Overlay Project <br />3. 12th Avenue (Birch to Holly Dr) <br />4. 2011 Street Reconstruction Project <br />5. 2013 Street Reconstruction Feasibility Study <br />6. Trunk Watermain from Park Ct. to Marshan Lane <br />CI -5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.