Laserfiche WebLink
B) Emergency Hole <br />Administration <br />Inspection after completion <br />0.25 X 40 = $ 10.00 <br />1.50 X 30 = 45 00 <br />Total Cost $55.00 <br />Proposed Fee X00 <br />C) Trench <br />Administration 0.25 X 40 = $ 10.00 <br />Verification <br />1) Plan Review 1.50 X 45 = $ 67.50 <br />2) Inspection <br />a) Location before work 0.50 X 30 = 15.00 <br />b) Compliance during work 1.50 X 30 = 45.00 <br />c) Completion after work 1.50 X 30 = 45.00 <br />d) Reinspection 0.75 X 40 = 30.00 <br />3) Testing Result Review <br />a) Compaction <br />b) Material <br />0.083 X 40 = 3.33 <br />0.083 X 40 = 3.33 <br />4) Mapping <br />a) Review data 0.50 X 45 = 22.25 <br />b) Transfer to Autocad 0.25 X 45 = 11.25 <br />c) Insert to overlay to tie in 0.50 X 45 = 27 75 <br />Total Cost 5244 <br />The average trench is 330 lin. ft. past the width of a <br />hole. Therefore, the number of 100 lin. ft. (or portion <br />thereof) units is 4. The cost per 100 lin. ft. unit is <br />275.40 / 4 = $68.85/100' unit. <br />Proposed Fees <br />31 <br />f <br />(Flue An1P FPP) <br />