My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05/05/2008 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2008
>
05/05/2008 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2014 10:44:50 AM
Creation date
5/8/2014 9:49:45 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
05/05/2008
Council Meeting Type
Work Session Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Obstruction Permit Fee <br />A) Administration 0.25 X 40 = $ 10.00 <br />B) Recording 0.25 X 40 = 10.00 <br />C) Review 0.75 X 45 = 33.75 <br />Minimum Base Coat $ 53.75 <br />Proposed Base Fee X44 <br />Plus additional fee based on length <br />Inspection <br />1) Compliance during work 1.50 X 30 = $ 45.00 <br />2) Completion after 0.25 X 30 = 7 50 <br />Additional fee on assumed 1000 lin. ft. permit = $ 52.50 <br />Additional cost per lineal foot = $52.50 / 1000 = 0.0525 <br />Proposed Fee = S50 M0 p>»Un nS rn ft <br />4. Permit Extension Fee <br />A) Administration 0.25 X 40 = $ 10.00 <br />B) Recording 0.083 X 40 = 3.33 <br />C) Review 1.0 X 40 = 40 00 <br />Total Cost = $ 53.33 <br />Proposed Fee = ss nn <br />5. Delay Penalty <br />A) Administration 1.5 X 40 = $ 60.00 <br />For up to 3 days of non - completion and non -prior notice <br />before specified completion date. <br />After 3 days, an additional charge of $10 /day will be <br />levied. <br />Total Penalty Charge = $ 60.00 <br />(Up to 3 days late) <br />Each day late over 3 days <br />32 <br />= S 61,0 <br />Plus i n nnmay <br />
The URL can be used to link to this page
Your browser does not support the video tag.