Laserfiche WebLink
• <br />• <br />• <br />May 28, 2008 <br />Estimated Project Costs <br />Sign (Tax exempt) <br />$28,900 <br />Freight (No charge if ordered by June 30) <br />$1,278 <br />Installation (Includes concrete, rebar, conduit, etc.) <br />$5,000 <br />Electrical <br />$4,000 <br />Crane <br />$1,500 <br />Data Cable /Phone Line <br />$400 <br />TOTAL* <br />$41,078 <br />*Does not include brickwork, landscaping, and irrigation <br />Annual Ongoing Costs <br />Electrical $100 <br />Insurance $ 55 <br />Maintenance (Bulb Replacement, etc) $ 50 <br />$205 <br />Other Issues <br />• Content and Design of Identification area (3' x 8') — must identify "City of Lino Lakes" <br />to conform to sign ordinance (off - premises signage not allowed) <br />• Placement and size of Lino Lakes Lions recognition placard <br />• Policy on permitted announcements <br />• Landscaping — Important, regardless of location, the message board looks <br />aesthetically pleasing and conforms to surrounding buildings, etc. <br />3 <br />