My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05/14/2014 P&Z Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2014
>
05/14/2014 P&Z Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2022 12:26:11 PM
Creation date
5/9/2014 4:14:05 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
05/14/2014
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The ACHD Engineering Plan Review process will apply to this development. Based upon the <br />number of lots within this development, the construction of a NB CR 53 right turn lane and a <br />SB CR 53 left turn lane (or possibly a SB CR 53 bypass lane) will be required to be <br />completed by the developer/City in conjunction with this development. Calculations must also <br />be provided along with a grading and erosion control plan that delineates the drainage areas <br />for this site. The post -development rate/volume of runoff must not exceed the pre -developed <br />rate/volume of runoff for the 10-year, critical design storm. County Ditch #32 is located in the <br />Rice Creek Watershed District, and the City/developer should coordinate drainage/discharge <br />affecting the county ditch with the Rice Creek Watershed District. An ACHD Engineering <br />Plan review fee of $450.00 will apply to this project. Contact Gina Pizzo, Engineer III, at <br />763.862.4248, email: Gina.Pizzo ckco.anoka.mn.us with any questions and to coordinate the <br />ACHD Engineering Plan Review process. Please submit the drainage calculations, grading and <br />erosion control plans, the ACHD Design Requirements list for County highway Modifications (copy <br />available via our web site), and the applicable engineering plan review fee to Ms. Pizzo for her review <br />and approval. <br />Once the ACHD Engineering Plan Review Process has been completed, the ACHD Permit process can <br />begin. An ACHD Permit to Work within the county ROW will be required and must be obtained by <br />the contractor completing the work prior to the commencement of any construction activity within the <br />county right of way (Permit for Work within County ROW=$150.00). License Permit Bonding, <br />methods of construction, work zone traffic control, restoration requirements and follow-up inspections <br />are typical elements of the permitting process. Once all necessary City and county approvals have <br />been obtained, the contractor can contact Terri Vaughan, Traffic Engineering Technician, at <br />763.862.4239, email: Terri.Vaughangco.anoka.mn.us for further information and to coordinate the <br />ACHD Permit process. <br />Thank you for the opportunity to comment.. Feel free to contact me if you have any questions regarding <br />this review. <br />Sincerely, <br />Jane K. Rose <br />Traffic Engineering Manager <br />xc: File - CR 53/Plats + Developments/2014 <br />Larry Hoium, County Surveyor <br />Jack Forslund, Multimodal Transportation Manager <br />Randy Bettinger, Traffic Engineering Coordinator <br />Josie Scott, Traffic Engineering Technician <br />Terri Vaughan, Traffic Engineering Technician <br />Gina Pizzo, Engineer III <br />
The URL can be used to link to this page
Your browser does not support the video tag.