My WebLink
|
Help
|
About
|
Sign Out
Home
Search
09/02/2008 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2008
>
09/02/2008 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2014 3:56:34 PM
Creation date
5/13/2014 1:13:54 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
09/02/2008
Council Meeting Type
Work Session Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />Chapter 7. Sanitary Sewer as ofAugustll, 2008 <br />Introduction: <br />The City of Lino Lakes has a total area of 21,450 acres, of which about 3,000 land acres is occupied by <br />the Chain of Lakes Regional Park and about 520 acres by the Interstate 35W and 35E corridors. The <br />remainder of the City includes extensive wetland areas and several small lakes. Sanitary wastewater <br />generated in the City is either treated in on -site systems or is collected in city owned sanitary sewers and <br />conveyed to Metropolitan Council interceptors for treatment at the Metropolitan Wastewater treatment <br />Plant in St. Paul. On -site treatment systems are generally located on larger lot developments in the City. <br />Most are in unsewered areas but a few remain in neighborhoods that received service after on -site <br />systems were built. <br />The City's Comprehensive Sewer Plan was first adopted in 1990. Portions were updated in 1999 and <br />incorporated into the City's Comprehensive Plan as "Public Facilities Plan - Sewer Element." The 2008 <br />Sanitary Sewer Plan is being prepared for two primary purposes. The first purpose is to provide <br />recommendations and guidance to the City by evaluating the comprehensive sewer system requirements <br />needed from now to the year 2030 and beyond. This is completed by developing a strategy to implement <br />a sanitary sewer system in accordance with the anticipated growth and development patterns of the City <br />and devising a proposed infrastructure system that can be feasibly and economically constructed to <br />support this growth. The second purpose is to produce documentation that can be used by state, local, <br />and regional agencies for planning purposes. This Plan evaluates the capacity and hydraulic capabilities of <br />both the City's existing and future sanitary sewer system. This chapter summarizes the full Plan. Figure 7- <br />1, Existing Sanitary Sewer System and Figure 7 -2, Sewer District Map depict the starting point of this <br />Chapter. <br />The scope of the full Plan is to document comprehensive sanitary sewer system requirements for the <br />City. The scope is limited to providing general guidance and alignment information for implementing <br />future trunk sewer lines and wastewater lift stations, based on anticipated long -term growth. The Plan <br />will allow the City to accommodate forecasted growth. A major focus of this Plan is estimating the <br />projected wastewater flow from the City and the required capital improvements through 2030. At the <br />same time, a long -term (beyond 2030) evaluation is necessary to determine future major facility <br />requirements. <br />7 -1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.